Laserfiche WebLink
3. IGMP3/Budget Development: <br /> M. Burton reviews iGMP3 slide.The slide shows a progression of all iGMP1 and 2,and currently where we are with iGMP3 summary <br /> breakdown. iGMP3 summary total is$27,547,942. 11/8/18 PBC presentation is attached for further details. <br /> 4. CM Contingency(w/in GMP): <br /> M. Burton reviews CM Contingency slide.The slide includes: <br /> Construction(CM)Contingency$1,323,423 <br /> Approved:$0 <br /> Pending:$236,720 <br /> Forecast:$0 <br /> Balance:$1,086,703 <br /> Remaining:82% <br /> 5. Owner Construction Contingency(outside GMP): <br /> M. Burton reviews Owner(GMP)Contingency slide.The slide includes: <br /> Owner(GMP)Contingency$1,500,000 <br /> Approved:$30,246 <br /> Pending:$364,177 <br /> Forecast:$421,491 <br /> Balance:$684,086 <br /> Remaining:46% <br /> M. Burton explains that the pending column includes the unforeseen soil issues. The project team has reviewed the pending COR's that <br /> are associated totaling$364,177. The forecasted$421,491 COR's are additional unforeseen soil issues/conditions the construction team <br /> anticipates. Walsh Brothers is performing additional test pits,with GZA present,to determine further soil conditions and exposure. Test pit <br /> drawing attached. The drawing indicates existing test pits and probes taken,and additional tests scheduled for 11/17. <br /> 6. Value Engineering: <br /> M. Burton reviews Value Engineering slide. In order to offset financial risk based upon current contingency expenditure(actual/ <br /> forecast)the Project Team has assembled a list of recommended VE Items,should TOL wish to reduce direct work costs and add <br /> money back to contingency and/or allowances within the GMP.Total recommended VE,$420k, no programmatic changes, <br /> minimal impact to building(Cosmetic only). VE items will impact FSB contractors and are subject to deduct change order pricing. <br /> Values on VE log for recommended VE Items have been adjusted down from estimate to approx.70%of the estimate value. <br /> Decisions on VE will be required upon approval of final GMP(December 13th,2018). TOL to confirm process for acceptance of <br /> any VE Items(potentially a Joint PBC/SC Meeting). <br /> The PBC reviewed and discussed the presented VE items recommended by project team to maintain budget. <br /> VE Log: <br /> ➢ All(D)items are new options added to the VE log <br /> ➢ The log indicates"Y"for yes, "N"for not recommended,"P"for potential""D"for deferred to the appropriate party to review <br /> and recommend. <br /> ➢ DPF has already reviewed and made recommendations <br /> ➢ PBC recommended: C2, C12, 02, S7, C1, C4, C7,C8, C16,and D4, C1 1/N12 as potential. N71, D10,and D19 are not <br /> recommended,and N19 as deferred. <br /> ➢ DiNisco notes that they reviewed the spray foam insulation with their consultants and have determined that it is not <br /> necessary,there is no need for it,and no reason to keep it. <br /> ➢ M.Cronin scheduling joint PBC/SC meeting for ultimate approval of VE. Potential dates include 12/4, 12/8. M. Cronin to <br /> confirm. <br /> PBC Meeting 11.08.18 2 <br />