Laserfiche WebLink
2. Hastings Elementary <br /> DPF staff presented the follow up data to respond to a prior recommendation by the design team to <br /> remove 1 inch of spray insulation from within the wall cavity at a potential savings of$110,000. <br /> Letter from Green Engineer outlining insignificant energy efficiency value amounting to an <br /> approximate $250 dollar increase in annual energy cost if removed. <br /> Letter from acoustic engineer outlining no acoustical consequence of having vs removing the 1 inch <br /> of insulation. <br /> PBC discussion focused on the value of this layer of insulation as an infiltration barrier and that it <br /> may still play an important role, and the elimination of it may not be an improvement. <br /> PBC recommended to leave the layer of insulation in place and have a deduct alternate inserted in <br /> the plans to obtain the value if removed. <br /> 3. Lexington Children's Place <br /> DPF staff presented the Bid Tabulation for receipt of the general bids for the LCP project. Four GC <br /> bids were received from prequalified GC's. The apparent low bidder is CTA Construction with a Bid <br /> of$10,423,000 with Alt. #1: $(9,000) and Alt. #2: $98,500. <br /> Also presented was a letter of recommendation from the design team recommending the award be <br /> made to the low open bid including Alt. #1. <br /> Staff outlined that Alt. #1 is to change the roofing from EPDM to PC and that presented a credit back <br /> to the town of$9,000. Alt. #2 was to change from Metal siding to Zinc siding at an added cost of <br /> $98,500. The change in Alt. #2 was purely an aesthetic choice as both materials had the same <br /> operational and performance criteria. <br /> Staff reviewed the project budget and the $80,271 overage of the Bid Costs ($11,916,000), as <br /> compared to the Funded Construction Budget ($11,835,729), and demonstrated the slight <br /> adjustments recommended to soft cost items within the budget (including a $27,000 savings from <br /> A/E costs) to support the increased Construction Cost while remaining within the overall Project <br /> Budget as funded. <br /> Motion made to recommend award of the Lexington Children's Place Contract for General <br /> Construction to the lowest, responsible, qualified and eligible bidder in accordance with MGL <br /> Bidding and award statutes, within the approved budget. <br /> Motion made, seconded and approved <br /> 4. Approval of PBC Minutes — PBC Committee <br /> PBC minutes for 8/16/18 were distributed and reviewed by the Committee <br /> Motion to approve the PBC minutes for August 16th, 2018. <br /> Motion made, seconded and approved <br /> PBC Meeting 09.13.18 2 <br />