|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-09-13-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-09-13-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
12/20/2018 12:53:02 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S,77SR^h0 TOWN OF LEXINGTON <br /> x p Permanent Building Committee <br /> Q 'zv D <br /> Permanent Members <br /> APRIL 14'" <br /> , Co-Chairman: Jon Himmel & Co-Chairman Dick Perry <br /> fix'"6`� Philip Coleman, Charles Favazzo, Carl Oldenburg,Peter Johnson, Howard Hobbs <br /> Project Specific Members <br /> Clarke&Diamond Schools Hastings Elementaty Fire Station Visitors Center LCP LCC <br /> Margaret Coppe Curt Barrentine Robert Cunha Joel Berman Teresa Hank <br /> Edwin Goodell Andrew Clarke Joseph Sirkovich Peter Kelly Wilson Manz <br /> September 13, 2018 <br /> Members Present: Jon Himmel, Dick Perry, Philip Coleman, Charles Favazzo, Carl Oldenburg, Curt <br /> Barrentine,Andrew Clarke <br /> DPF Staff: Mike Cronin/Director of Public Facilities, Mark Barrett <br /> 7:00 -The meeting was called to order—201 Bedford Street <br /> 1. Fire Stations —Jeff McElravy(Tecton Architects) <br /> Jeff updated the PBC on the status of the Temp Fire Station. The GC has been trending a touch <br /> behind schedule on some parts of the project, however they are tentatively scheduled to perform <br /> the punch list on Tuesday 9/18/18. We had originally planned to move fire admin in on 9/21 and <br /> operations on 9/28. These dates are likely being pushed to 9/27 and 10/4, to make sure the <br /> renovation work is complete. We are still waiting for Verizon to reinstall telephone service which <br /> is also required for occupancy. <br /> PBC asked about inspections , it was reported that above ceiling inspections were complete and <br /> that the inspections group is very good about making frequent site visits to stay on top of issues <br /> to be sure a final walkthrough/inspection doesn't lead to a long list of items that would effect <br /> schedule. <br /> Jeff updated PBC that the Filed Sub Bids were received for the Main Fire station and in total <br /> ($7,596,021)were .5% higher than the estimate of same ($7,557,280). The General Bids were <br /> also received with an apparent low bid of$14,283,000 against an estimate of$14,983,694. In <br /> total the bids received are within budget and the PBC was asked to support a recommendation <br /> of award, pending completion of the due diligence review of the bids received, reference checks, <br /> etc. <br /> PBC asked if there would be a timing issue with the award of this contract and the completion of <br /> the temp facility. <br /> Motion made to recommend award of the Fire Station HQ contract for General <br /> Construction to the lowest, responsible, qualified and eligible bidder in accordance with <br /> MGL Bidding and award statutes, within the approved budget. <br /> Motion made, seconded and approved <br /> 201 BEDFORD STREET• LEXINGTON, MASSACHUSETTS 02420 <br />
The URL can be used to link to this page
Your browser does not support the video tag.