Laserfiche WebLink
2. Westview Cemetery—Justin Humphrey(TBA Architects) <br /> Justin's presentation reviewed changes that have been discussed in the past few months. The plan <br /> is to still to build in a new location within the cemetery, going from a current 2300 sq. ft. building to <br /> 3800 sq. ft. This would allow for continued use of the facility during construction. <br /> • The current facility is undersized and in poor condition. The new facility would provide an <br /> appropriate visitor/bereavement area that does not exist with the current facility. Administration <br /> and the waiting area would be segregated from the operation/maintenance area of the building. <br /> • The operation side of the facility would include landscaping and ground maintenance, burial <br /> equipment storage, 3 bay garage, and workroom. <br /> • The new location would open up more desirable land for gravesite development where the <br /> current facility exists, and improve traffic flow helping to alleviate in/out traffic on Bedford Street. <br /> • Elevation and materials were discussed. Sustainable design was briefly reviewed and the option <br /> for further sustainable review can be done at Design Development. <br /> This revised plan presented an option for incorporating a Crematory. It was stated that further <br /> direction is needed with the Board of Selectman. <br /> PBC asked how they vet the program for use and needs. Justin has a comprehensive study from <br /> earlier which can be provided to the board. <br /> Motion to adjourn was made and seconded: Meeting adjourned at 8:40pm. <br /> PBC Meeting 06.20.18 2 <br />