2018-06-20-PBC-min.rev
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-06-20-PBC-min.rev
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
9/20/2018 1:22:25 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> S177516? <br /> NtiC TOWN OF LEXINGTON <br /> k A <br /> D Permanent Building Committee <br /> a 3 <br /> A Permanent Members <br /> Lan <br /> ARRILI'Y' , Co-Chairman: Jon Himmel&Co-Chairman Dick Perry <br /> Fx'"G1O Philip Coleman, Charles Favazzo, Carl Oldenburg, Peter Johnson, Howard Hobbs <br /> Project Specific Members <br /> Clarke&Diamond Schools Hastings Elementary Fire Station Visitors Center Pelham Road <br /> Margaret Coppe Curt Barrentine Robert Cunha Joel Berman Hank Manz <br /> Edwin Goodell Andrew Clarke Joseph Sirkovich Peter Kelly Teresa Wilson <br /> June 20, 2018 <br /> Members Present: Dick Perry, Philip Coleman, Carl Oldenburg, Robert Cunha, Joseph Sirkovich <br /> Members Absent: Jon Himmel, Charles Favazzo, Peter Johnson, Howard Hobbs, Mark Barrett <br /> DPF Staff: Mike Cronin/Director of Public Facilities, Ann Marie Ponzini <br /> 7:05- The meeting was called to order— 201 Bedford Street <br /> 1. Main Fire Station —Jeff McElravy (Tecton Architects), John Wilson (Lexington Fire Chieo <br /> Jeff's presentation reviewed the 90% CD estimate. The estimate was also compared with Miyakado, <br /> a 3rd party source. <br /> • Site costs estimates went down. Sewer line replacement showed a decrease, however extra <br /> money has been built in if unexpected developments arise. <br /> • The Building Construction Base Cost and Site Construction Base Cost Differences between <br /> Rider, Levett, Buchnell (RLB) and 3rd party Miyakado were reviewed. <br /> • A duel fuel and natural gas generator was reviewed as an option. After further discussion a <br /> diesel fuel generator would be the best option. <br /> Motion by PBC is to use a Diesel Fuel Generator for the New Fire HQ. <br /> Seconded —APPROVED <br /> Jeff gave an overview of the sub-contractor evaluations. Many of them have good reviews, and <br /> there are some still waiting for references. <br /> 201 BEDFORD STREET 9 LEXINGTON, MASSACHUSETTS 02420 <br />