Owners Contingency (construction & owner) $2,000,000 <br /> Total Project Budget $65,279,418 <br /> Discussion on VE list as Applicable <br /> Don't need to exercise any VE. <br /> Have updated ROM's estimated at (600k) <br /> Motion to approve the TPB for MSBA 60% CD submission with total construction cost at <br /> $52,973,418 and total project budget of$65,279,418. Seconded -APPROVED <br /> Discussion: <br /> Q: Have the GC's-been established? Yes. Number of full time equivalence during construction. Varies, <br /> but consistently 5. Super., Asst. Super., PM, APM, Field Engineer, Safety, PX. <br /> Q: Cost if full time safety worker on site? Start of steel through full construction 18-20 months. Full time <br /> safety $8k a month, $100k minus what is already been carried. OPM, onsite clerk, PM, Px, APM. <br /> Q: What awards are to be made between now and the fall? Temp gas lines, waterproofing. Small GMP, <br /> and final GMP Oct/Nov. On site 6/4 surveyors. Officially on site 6/8. <br /> Q; Is any VE needed to make budget? After joint PBC/SC meeting, already took some of the low <br /> hanging. <br /> Q;Any deduct alternates? Not at this point. <br /> Due diligence to make most cost-effective building possible <br /> Q; Solar in parking lot? Not at this time, still working on RFP. <br /> Motion to adjourn was made and seconded: Meeting adjourned at 8:00pm. <br /> PBC Meeting 05.24.18 2 <br />