Laserfiche WebLink
13 <br /> S177516? <br /> NtiC TOWN OF LEXINGTON <br /> k A Permanent Building Committee <br /> a 3 <br /> A Permanent Members <br /> Lan <br /> ARRILI'Y' , Co-Chairman: Jon Himmel&Co-Chairman Dick Perry <br /> Fx'"G1O Philip Coleman, Charles Favazzo, Carl Oldenburg, Peter Johnson, Howard Hobbs <br /> Project Specific Members <br /> Clarke&Diamond Schools Hastings Elementary Fire Station Visitors Center Pelham Road <br /> Margaret Coppe Curt Barrentine Robert Cunha Joel Berman Hank Manz <br /> Edwin Goodell Andrew Clarke Joseph Sirkovich Peter Kelly Teresa Wilson <br /> April 12, 2018 <br /> Members Present: Jon Himmel, Dick Perry, Philip Coleman, Charles Favazzo, Carl Oldenburg, <br /> Robert Cunha, Joseph Sirkovich,Andrew Clarke, Teresa Wilson <br /> Members Absent: Peter Johnson, Howard Hobbs, Curt Barrentine, Hank Manz <br /> Historic Districts Commission (HDC): Paul O'Shaughnessy, Anne Eccles, Edward Adelman, <br /> Thomas Fenn, Bob Adams <br /> DPF Staff: Mike Cronin/Director of Public Facilities, Mark Barrett, Ann Marie Ponzini <br /> 7:00 - The meeting was called to order— 201 Bedford Street, Cafeteria <br /> 1. Fire Station Exterior Design Review with HDC— Jeff McElravy& Matt Salad (Tecton Architects) <br /> John Wilson (Lexington Fire ChieQ <br /> Jeff's presentation showed a front schematic rendering of the proposed Fire HQ. Front, back and <br /> side elevation drawings were also presented. <br /> • The four bay doors will utilize a bi-fold door which opens to the side. The doors open quicker, <br /> are more reliable, and won't block ceiling lighting & sprinklers like an overhead opening door <br /> would. <br /> • Solar for hot water collector will be located on the back roof shielded from view by gables. The <br /> rest of the roof will be covered in solar [PV] panels. <br /> • Exterior material samples were reviewed by the HDC. HDC commented on the expanse of <br /> concrete in front of the apparatus bay doors and a desire to break up the mass visually. It was <br /> asked if something could be done to make it look more inviting; possibly stamping, adding a <br /> color or adding a stripe for each bay door. This will be further reviewed by the design team. <br /> • Truck washing will be done in the back of the building with special drainage for water disposal, <br /> and won't have an effect on the concrete area in front of the bay doors. <br /> HDC's portion of the Fire Station Review concluded at 7:351). <br /> Continued Fire Station Review with PBC <br /> Jeff discussed with the committee the use of a Gas Boiler System to serve the Radiant Floor. <br /> Radiant flooring would only be used in the apparatus bay area during the winter months. The gas <br /> boiler could also serve for emergency backup to help during power outages which would reduce the <br /> emergency generator size. <br /> • PBC asked about the size and footprint of the emergency generator and decibel difference as <br /> well as the day tank size and overall unit size. <br /> • DPF asked if the radiant floors are to be heated by gas; what the cost savings and operating <br /> costs would be. <br /> 201 BEDFORD STREET 9 LEXINGTON, MASSACHUSETTS 02420 <br />