PLANNING BOARD MEETING
<br />October 7, 1974
<br />The meeting of the Lexington Planning Board was called to order at 7:35 p.m.
<br />by the chairman Dr. Clarke, with members S. Brown, L. Brown, MacKenzie,
<br />Costello and secretary Mrs. Snow present. Also in attendance were Rosemary
<br />O'Leary, Lexington Minute -Man, and Paul Restuccia, Lexington Patriot.
<br />Mr. & Mrs. Andrew Bayles were present to present a plan submitted on FORM A74-26
<br />October 3, 1974, with Application Form A74-26, proposing division of land BAYLES
<br />at Massachusetts Avenue, and requesting legal frontage on Stratham Road. STRATHAM RD.
<br />Pending investigation as to legal status of Stratham Rd., action on the
<br />application was deferred.
<br />The Board reviewed a plan submitted with Form A74-25, showing conserva-
<br />tion land at the Lexington/Winchester line. Upon a motion duly made and
<br />seconded, it was VOTED:
<br />The plan submitted on October 1, 1974, by James Marino Tr., Marco
<br />Realty Trust, with Application Form A74-25, entitled "Plan of Land in
<br />Lexington, Mass.", dated Sept. 27, 1974, by Frederick R. Joyce Co.,
<br />showing Lot C and part of Lot A as easement to Lot C. at the Lexington/
<br />Winchester line requires no approval under the Subdivision Control Law.
<br />The plan was so endorsed by members of the Board.
<br />Minutes of September 16, 1974, were reviewed, and suggested revision to
<br />the portion regarding the St. Brigid's housing appeal was considered.
<br />Action on the minutes was tabled pending revision.
<br />Minutes of September 23, 1974, were approved as written.
<br />Engineering Dept. letter, dated 10/4/74, to the Bd. of Health, regarding
<br />review of the definitive plans for Woodpark Estates subdivision was read
<br />by the chairman, and conditions to be included in a Planning Bd. Certifi-
<br />cate of Action were discussed. Mr. McSweeney, Dir. of Public Wks/Engr.,
<br />joined the meeting and participated in discussion with respect to construc-
<br />tion of sewer in the subdivision. Upon a motion duly made and seconded,
<br />it was VOTED:
<br />To approve the definitive subdivision plan entitled "Woodpark Estates,
<br />Lexington, Mass.", by Colburn Engineering, dated July 31, 1974, revised
<br />September 27, 1974, revised October 4, 1974, Andrew J. Lane, applicant,
<br />subject to terms and conditions of a Covenant given under the provisions
<br />of Section 81U, Chapter 41 of General Laws and subject to further terms
<br />and conditions enumerated below:
<br />1. The Planning Board waives the requirement for installation of side-
<br />walks as stated in Section 7.3.5 of the Rules and Regulations Governing
<br />the Subdivision of Land in Lexington, Mass.
<br />2. The Planning Board agrees to allow Woodpark Circle to be built to
<br />24 ft. pavement width.
<br />3. Granite curbing shall be required in back of catch basins, and from
<br />Wood STreet to. Station 65.79, with bituminous berm thereafter.
<br />FORM A74-25
<br />WIN/LEX LINE
<br />MARCO REALTY
<br />TRUST
<br />MINUTES 9/16
<br />MINUTES 9/23
<br />WOODPARK EST
<br />SUED.
<br />APPROVAL
<br />
|