|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-04-05-ATM-CPC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2010
>
Reports
>
2010-04-05-ATM-CPC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 2:02:56 PM
Creation date
7/25/2018 9:01:21 AM
Metadata
Fields
Template:
Archives
Year
2010
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Community Preservation Committee report to Town Meeting ATM 2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 (q) <br /> Project: Stone Building Exterior Stabilization <br /> CPA Category: Historic Resources <br /> Amount Requested: $202,933 <br /> Amount Recommended: $202,933 <br /> CPC Vote: (9-0) <br /> Project Description: <br /> This project is requesting funds to stabilize the Stone Building. A Historic Structure <br /> Report (HSR) was completed by Menders, Torrey, and Spencer during the summer of <br /> 2009. The HSR recommended immediate stabilization work, winterization of the <br /> building, which was completed in the fall of 2009 for approximately$12,000 and <br /> $40,000 was used to complete an HSR. The HSR detailed additional necessary, exterior <br /> stabilization work which includes a new roof, gutters, removal of aluminum siding, <br /> repair and painting of wood siding, and re-glazing of windows. This necessary, exterior <br /> stabilization work should be completed during the summer of 2010 and will cost <br /> $202,933. During 2009 ATM, Town Meeting authorized$180,000 in CPA funds for FY <br /> 2010 to perform the work outlined in the HSR needed to stabilize the building. However, <br /> after the HSR was completed, it was determined that $202,933 was needed to complete <br /> the exterior work on the building. Therefore, approximately $128,000 of the FY 2010 <br /> authorization has not been spent and will be returned to the CPA fund, so the net <br /> cost to the Community Preservation Fund (CPF) is approximately $75,000. <br /> Project Goals and Objectives: <br /> The goal of the project is to stabilize the building envelope and protect this historic <br /> structure while the future use of the building is determined. <br /> Project Benefit: <br /> The 2009 HSR report recommended that if the Town should decide to defer renovation <br /> and redevelopment of the Stone Building beyond the summer of 2010, then the building <br /> should be stabilized in 2010 to prevent the potential of water damage from leaks in the <br /> building envelope. Although the plan to utilize the Stone Building as a Heritage <br /> Collaborative is still in development, the value of stabilizing the building exterior at this <br /> time will not be lost in future construction/renovation should the Town decide to renovate <br /> the building interior and add an addition on the back of the building. Deferring the <br /> stabilization increases the risk of damage to the building from leaks in the building <br /> envelope and delays the opportunity to improve the aesthetics of the structure for the <br /> surrounding neighborhood. <br /> Funding Request: <br /> This project requests $202,933 in CPA funds to complete the building envelope <br /> stabilization. This funding request includes $2,000 to update the Massachusetts Historical <br /> Commission Inventory Form "B". <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.