|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-04-05-ATM-CPC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2010
>
Reports
>
2010-04-05-ATM-CPC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 2:02:56 PM
Creation date
7/25/2018 9:01:21 AM
Metadata
Fields
Template:
Archives
Year
2010
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Community Preservation Committee report to Town Meeting ATM 2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE S (k) <br /> Project: Municipal Building Envelope <br /> CPA Category: Historic Resources <br /> Amount Requested: $73,000 <br /> Amount Recommended: $73,000 <br /> CPC Vote: (9-0) <br /> Project Description: <br /> The Department of Public Facilities is requesting$73,000 in CPA funds to perform extraordinary <br /> repairs at the Town Office Building and Cary Memorial Building. In addition to the extraordinary <br /> repairs, a Massachusetts Historical Commission Inventory Form`B"will be completed for both <br /> buildings. <br /> Project Goals and Objectives: <br /> 1. Cary Memorial Building($27,000) -Replace 1,350 square feet of built-up flat roof. The <br /> replacement of these two roofs is part of the Public Facilities roofing Master Plan. The <br /> two roofs are over the east and west front stairwells. <br /> 2. Cary Memorial Building($20,000) -Restore ornamental fans at the intersection of the <br /> architrave and the stairwell roofs. One ornamental fan is in storage and the second will be <br /> reconstructed to match the original. Original paint colors will also be restored. <br /> 3. Town Office Building($22,000) -Replace three copper valleys. These copper valleys <br /> were observed to need replacement during the extraordinary repair of the roof during the <br /> summer of 2009. <br /> 4. Services of an Architect($4,000) -that specializes in Historic Structures to fully <br /> document the Town Office Building and Cary Memorial Building as per Massachusetts <br /> Historical Commission Inventory Form`B". <br /> Project Benefit: <br /> 2008 Town Meeting authorized $95,000 in CPA funds and $30,000 from the tax levy to <br /> implement building envelope extraordinary repairs (copper ridge vents, gutters, downspouts) and <br /> painting of the Town Office Complex. During the implementation of the project during the <br /> summer of 2009,Public Facilities identified additional work to be performed that exceeded the <br /> original scope.This additional scope includes three copper valleys on the Town Office Building <br /> slate roof and restoring elements of Cary Memorial Building that had been eliminated during <br /> previous repairs.This restoration work will include restoring original building details that will <br /> enhance the appearance of the Town Office Complex. <br /> Funding Request: <br /> The total funding request for this project is $73,000 and is estimated as shown above (See <br /> numbers 1 -4). This CPA appropriation of$73,000 will be augmented by an additional amount of <br /> $161,534, which is to be funded from the tax levy under Article 16(h). The total appropriation for <br /> this project is therefore$234,543. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.