|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-06-27-CEC-ATM-rpt (Combined Report with Updates & Errata)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2018
>
Reports
>
2018-06-27-CEC-ATM-rpt (Combined Report with Updates & Errata)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:56 PM
Creation date
6/28/2018 8:53:35 AM
Metadata
Fields
Template:
Archives
Year
2018
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM (incorporating Updates & Errata)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> operations would be handicapped due to equipment down time and excessive repair costs. The FY2019 <br /> request, by funding source, is shown in the table below. <br /> "Each piece of equipment is inventoried with original and current replacement cost, state of condition and <br /> replacement time interval. Replacement intervals vary from five to 25 years and are based on <br /> manufacturer recommendations and use(type and duration). <br /> "The selection of vehicles to be replaced begins with the proposed replacement date. Then each vehicle is <br /> assessed as to its mechanical condition and work requirements. The systematic replacement program <br /> defines what equipment is expected to need replacement during the next five years with the intent of <br /> preventing any unexpected emergency purchases. Annual updates are conducted by the Road Machinery <br /> Division, Division Superintendents and reviewed by the Manager of Operations and Director of Public <br /> Works." <br /> Water <br /> Retained <br /> Equipment GF Debt Earnings Total <br /> F450 Utility Truck-Public Grounds $ 107,000 $ 107,000 <br /> Medium Duty Hook Loader-Public Grounds $ 165,000 $ 165,000 <br /> F450 Dump Trucks(2)-Public grounds $ 214,000 $ 214,000 <br /> Utility Trailers- Public Grounds $ 40,000 $ 40,000 <br /> Water Valu:Turner-Water Division $ 30„V0 $ 30,000 <br /> 6 Wheel Hook Loader with Wing Plow and Spreader-Snow Ops. $ 275,000 $ 275,000 <br /> Salt Spreader-Snow Ops. $ 73,500 $ 73,500 <br /> Bonbardier Sidewalk Tractor with Snow Blower-Highway $ 165,000 $ 165,000 <br /> w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w <br /> Total $1,039,500 $ 30,000 $1,069,500 <br /> (Brown Book X1-7 &24) <br /> The Water Valve Turner is an automated valve turning device that is used to test and exercise <br /> below—street water valves. It has the capacity to automatically count the number of turns needed for each <br /> different water valve in Town, and to measure the necessary torque applied. <br /> More information about this project is in the section titled Programs, Public Works, DPW Equipment on <br /> Page 26. <br /> Project Description Amount Funding Committee Recommends <br /> Requested Source <br /> (i) Townwide Signalization $1,100,000 GF (Debt) Approval (6-0) <br /> Improvements <br /> "This is an annual request that seeks funds to update traffic and pedestrian signals in Lexington. A signal <br /> inventory and compliance study has been completed which includes ADA compliance, condition <br /> assessment, signal timing, delays and priority recommendations. FY2018 funds were used to implement <br /> issues identified by the Transportation Safety Group (TSG). The design at the intersection of <br /> Massachusetts Ave. at Worthen Road has progressed to 25% design and is currently moving toward <br /> 100% design. This FY2019 appropriation is anticipated to be used for the construction of those <br /> intersection improvements, including geometric improvements, full replacement of the traffic control <br /> equipment, signals, mast arms and opticom. The ongoing improvements will improve vehicle safety, <br /> prevent equipment failure, improve traffic flow, decrease energy consumption and allow for proper <br /> accessibility.” <br /> (Brown Book XI-8) <br /> The increase from the usual, annual, funding of$125,000 reflects that a reconstruction of the Worthen <br /> Road/Massachusetts Avenue intersection is also being funded. <br /> More information about this project is in the section titled Programs, Public Works, Townwide Signal <br /> Improvements on Page 22. <br /> 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.