CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> was stopped at that point because unresolved issues with the Project failed to gain approval of <br /> construction funding for the first phase (the above-cited intersection) at the 2015 ATM, under <br /> Article 11(a).. As issues with the designs for the first and subsequent phases still remained at the time of <br /> the 2016 ATM, another request for construction funds (under Article 10(a))was Indefinitely Postponed. <br /> Because many design elements (primarily, but not solely, related to later phases in the CBD) remained in <br /> question, on February 22, 2016, the BoS established a Center Streetscape Design Review Ad hoc <br /> Committee to specifically investigate a broad set of design elements and make recommendations to the <br /> BoS. That Committee completed its work and made a final presentation to the BoS in a public meeting on <br /> January 30, 2017. Many of the recommendations for the design choices were not the same as used by the <br /> architects for the 25% design. That Committee urged the BoS to obtain a revised 25% design (and cost <br /> estimate) that reflected their design choices. The BoS accepted nearly all of the proposed design choices <br /> and directed the Town Manager to have the 25% design revised, accordingly. <br /> Articles 10(j) and 12(a) of the 2017 ATM were to be the new request for the construction funding for the <br /> first phase of the project; however, based on the need for the revised design, the BoS decided to move for <br /> Indefinite Postponement of Article 12(a). The CPC moved the same for Article 10(j), with the intent to <br /> defer any funding request for this Project to the 2018 ATM; however, there is no FY2019 funding <br /> request. (See Article 16(e)regarding what was to be the FY2019 funding.) <br /> DPW Equipment <br /> DPW currently has 154 pieces of significant equipment (including vehicles). The current <br /> equipment—replacement value is approximately $9.5 million and includes pick-up and dump trucks, <br /> construction vehicles, and specialized equipment including pumps, rollers, sprayers, and mowers. <br /> Replacement intervals vary from 5 to 20 years and are based upon manufacturers' recommendations and <br /> DPW experience. Of these, 95 pieces had an individual acquisition cost in excess of$25,000; therefore, <br /> their replacement would normally be characterized as Capital and subject to this Committee's review. <br /> DPW has developed a well-conceived program, which includes annual updates produced by Division <br /> Superintendents, with review by the Manager of Operations and Department of Public Works Director. <br /> This program replaces older, less fuel-efficient, and high-maintenance equipment with standard, <br /> off—the—shelf, vehicles and equipment that will last longer and cost less to maintain and operate. <br /> Replacement of automobiles and all with individual acquisition costs under $25,000 is funded with <br /> operating funds. The current 5-year equipment-replacement schedule projects annual costs between <br /> $1,000,000 to $1,300,000 per year. For the FY2019 funding request, see Article 16(h). <br /> 26 <br />