ARTICLE 10 (b) <br /> Project: Community Center Sidewalk <br /> CPA Category: Historic Resources <br /> Amount Requested: $365,000 <br /> Amount Recommended: $365,000 <br /> CPC Vote: 6-1) <br /> Project Description: <br /> The 2014 March Special Town Meeting appropriated funds to renovate the Community Center. <br /> At the time of the funding request, the design of the sidewalk from Marrett Road to the <br /> Community Center was not yet complete. $50,000 for design was appropriated by the 2015 <br /> Annual Town Meeting and since that time, the Town has conducted meetings with the <br /> proprietors of the adjacent Scottish Rite Museum to determine the location and design of the <br /> sidewalk. <br /> The proposed plan will fund the installation of a new, 435' cement concrete sidewalk to connect <br /> with the existing sidewalk along the Community Center driveway. The project also includes the <br /> installation of pedestrian-level solar LED lights and two handicapped-accessible ramps at the <br /> Community Center entrance on Marrett Road. The construction of a third ramp on the far side of <br /> Marrett Road and a crosswalk will also be included as part of the project but will not be funded <br /> with CPA monies. (As of this report's publication date, the funding source for the ramp and <br /> crosswalk was undetermined). <br /> Project Goals and Objectives: <br /> • Construct a sidewalk connecting Marrett Road to the Community Center; and <br /> • Provide safe pedestrian access to the Town-owned facility. <br /> Project Benefit: <br /> Currently a public sidewalk leading to the Community Center does not exist. Constructing a <br /> path from Marrett Road to the building will provide a safe pedestrian path for those who do not <br /> access the Community Center by car. The construction of a sidewalk will also put the <br /> Community Center in compliance with the Board of Selectmen directive that requires all public <br /> buildings to be accessible by sidewalk. The new sidewalk will also improve handicapped- <br /> accessibility to the facility. <br /> Funding Request: <br /> $365,000 is requested in FYI for construction. <br /> 10 <br />