Laserfiche WebLink
management is proposed. He explained that they have not had a chance to do test pits yet, but are <br /> proposing test pits. <br /> Mr. Hamilton entered the Engineering Report into the record. <br /> Questions and comments from the Commission: <br /> The commission stated that they need a test pit to approve the project. <br /> The commission reminded the applicant about the Town storm water standards. <br /> The commission stated that they want the geotextile removed from the bottom of the system. <br /> Motion to continue the meeting to 2/20/2018 at the applicant's request made by Ms. Ladd and <br /> seconded by Mr. Beuttell. Vote: 5-0 in favor. <br /> 8:10pm <br /> DEP 201-1090, BL 1047 <br /> NOI, 22 Longfellow <br /> Owner: Ozan Dokmecioglu <br /> Applicant: John Degnan <br /> Project: Home addition <br /> John Degnan- builder <br /> Documents: Proposed site plan 1/31/2018, Stormwater report 1/31/2018, Engineering report <br /> 2/2/2018, NOI package with attachments 1/16/2018 <br /> Mr. Degnan explained that he is proposing to building a farmers porch on the front of the house <br /> and add a second story above the existing breezeway. <br /> Mr. Hamilton entered the Engineering Report into the record. <br /> Questions and comments from the Commission: <br /> The commission stated that they need a clear plan showing where the addition is located. <br /> The commission sated that the geotextile fabric should be removed from the bottom of the <br /> system. <br /> Questions and comments from the public: <br /> Rose Harvey, 21 Longfellow Road, asked what the concerns regarding water is with this project. <br /> Mr. Hamilton explained the commission's goals and what they aim to protect. <br />