Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-01-18-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-01-18-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
2/16/2018 10:05:26 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC was concerned about the 5 foot width of the corridor to the apparatus tent. Jeff stated that <br /> could be increased to 6 feet. <br /> The Fire Headquarters (HQ) Design Development (DD) was also discussed. <br /> • Some areas of minor concern were presented from the Hazardous Materials Investigation. <br /> • Signal systems have been reviewed. <br /> • Soil samples currently are out for testing. The landscape work is being revisited. <br /> • Design revisions are in process for the canopy & dormer. <br /> DPF stated they are in communications with the town council regarding Camilla Place easement, <br /> and that it is updated properly. Moving of the road is required to provide public parking against the <br /> building as designed. <br /> The DRT (Design Review Team) asked that snow removal and snow storage on site be understood. <br /> Review of the Energy Model showed at 14.2% above building code on savings. Cost will be more <br /> due to being an all electric system. On target for surpassing the stretch code and LEED Silver. <br /> Jeff informed the committee the schedule is a little behind due to finalizing some meetings that <br /> needed to happen. The bid pack for the Interim HQ will be ready at the end of January. The <br /> schedule shows a 5 week review period and a 4 month construction period. <br /> 3. Visitors Center Update Don Mills (Mills Whitaker Architects) <br /> Don updated the committee on past and present phases of the Visitor Center Project. October of <br /> 2017 approved the DD phase at Special Town Meeting. <br /> An informal review with the Historic Districts Commission discussed design, exterior materials, and <br /> value engineering items. December 2017 meetings with Public Facilities & Economic Development <br /> discussed approval of plans and elevation concerns. <br /> At present the following have been addressed: <br /> • Distribution of plans and elevations to consultants. <br /> • Soil Borings; unforeseen water piping &telephone wiring. The 1St boring showed water well <br /> below planned basement, and site characteristics are good. <br /> • Preparation for energy modeling & analysis, and make initial contact with Eversource for <br /> energy incentives. <br /> • Review of updated site planning consideration. <br /> • Discussion with Revere Copper for possible donation/reduced rate if the decision is made to <br /> use copper. <br /> Don discussed dates for the DD phase and final reviews before presentation to Annual Town <br /> Meeting. <br /> • February 2018— Engineering DD Submission to the Architect <br /> • March 2018 — DD Package to the Estimator. Review with PBC & HDC followed by review <br /> with Board of Selectman. <br /> A review of Don's slide presentation showed the basement layout for bathrooms, addition of a <br /> costume room, and storage area. The 1 st floor layout incorporated outdoor bathroom access, a <br /> PBC Meeting 01.11.18 2 <br />