Laserfiche WebLink
Rick reviewed the Project Costs for the Schematic Design. It was suggested to keep the site work <br /> line separate. <br /> PBC asked if any elevation have been done for the narrative and design. <br /> The estimates should allow for reasonable design flexibility consistent with the design precedence <br /> established on either DiNisco school projects. <br /> Motion to adjourn was made and seconded: Meeting adjourned at 9:00pm. <br /> PBC Meeting 08.23.17 3 <br />