|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-08-09-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-08-09-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:00 PM
Creation date
11/13/2017 2:58:23 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC asked about the Fire Apparatus exhaust system in the bays. It was stated that exhaust/hose <br /> connections will allow any truck to park in any bay. Parking on Camellia Place side with lunch time <br /> traffic can get really busy, and some discussion took place. Further discussion on parking will be <br /> further reviewed. <br /> 2. Visitors Center Update Don Mills (Mills Whitaker Architects), Dawn McKenna & Maureen Ryan. <br /> (Lexington Tourism Committee) & Melissa Tintocalis (Director of Economic Development) <br /> Don Mills discussed his slide presentation and the changes from the previous design review. <br /> Square footages were updated and the footprint incorporates a full basement with bathrooms in this <br /> location, along with storage & utilities. <br /> • The 1 st floor showed an open retail area, kiosks, a customer service center and a <br /> revolutionary history room. Changes with the elevator resulted in a cost savings of 100k. <br /> • The 2nd floor was redesigned pulling in the gable walls on the north and south sides to reduce <br /> roof mass. The west wing was lowered creating shallow roof dormers. The overall height <br /> was reduced 3 '/2 feet. <br /> • The south elevation shows a canopy entrance, north elevation has a shallow porch and there <br /> is a veranda for the back entry welcoming pedestrians from the bike path. <br /> • Survey has been done. Site planning showed sewer pipes are plenty deep enough to <br /> support plumbing in the basement. <br /> • Building materials for pricing were discussed. <br /> Dawn brought to attention exhibit work like the Diorama is supposed to be part of the funding for this <br /> program. Historic monitoring would be required during excavation and this is where the Historic Society <br /> involvement would be helpful. Dawn discussed the Battle Green Master Plan and possibly the walkway <br /> around the Visitor Center may be eligible under this plan. <br /> PBC stated overall the designs look pretty good; still some concern with the Meriam Street side of the <br /> building. The long length of the building and condensers being located on this side. Further discussion <br /> is needed. <br /> Motion to adjourn was made and seconded: Meeting adjourned at pm 9:45pm. <br /> PBC Meeting 08.09.17 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.