CAPITAL EXPENDITURES COMMITTEE REPORT TO OCTOBER 16,2017, STMs 2017-2&-3 <br /> Article 4:APPROPRIATE Fund Funding <br /> DESIGN FUNDS FOR Authorization Source Committee Recommends <br /> FIRE Requested <br /> HEADQUARTERS $676,300 GF (Debt) Approval(7-0) <br /> (Expected to be <br /> included in a <br /> subsequent Debt- <br /> Exclusion <br /> Referendum) <br /> "To see if the Town will vote to raise and appropriate a sum of money for design, engineering and <br /> architectural services, including production of construction documents, for a new Fire Headquarters; <br /> determine whether the money will be provided by the tax levy, by transfer from available funds, by <br /> borrowing or by any combination of these methods; or act in any other manner in relation thereto." <br /> "DESCRIPTION: These funds will permit the design work for the new fire station at the original <br /> Fire Headquarters site to proceed through the construction document development stage. Subsequent <br /> funding for construction will likely be requested at a Town Meeting in the Spring of 2018." <br /> (Town Warrant, 18 Sep 2017) <br /> Lexington's main Fire Station and Fire Department Headquarters (LFDHQ) opened in 1947, when the <br /> Town's population was approximately half what it is today, and the role and equipment of the fire <br /> department were quite different. LFDHQ's shortcomings have been chronicled and evaluated in several <br /> reports over the past decade'. Town Meeting approved appropriations to study alternative locations and <br /> the facility requirements for a renovation or replacement. Based on those reports, Town Meeting <br /> approved the purchase of 171/173 Bedford Street(now identified as 173 Bedford Street.) for use as swing <br /> space during construction of a replacement facility at the current 45 Bedford Street facility(STM 2016-5). <br /> Subsequently, TM approved$450,000 to bring the replacement project through design development, with <br /> the expectation that this STM would be asked to approve funding through Construction Documents, with <br /> a debt-exclusion referendum to follow, for construction funding approval. <br /> ATM 2014,Article 14K Design Study IP HQ Requirements <br /> STM 2015-2,Article 6 Study $20,000 Potential Site Evaluation <br /> STM 2016-5,Article 2 Land Acquisition and $4,443,000 Swing Space <br /> Designer/Traffic Study <br /> STM 2017-1,Article 2 Design Development $450,000 45 Bedford Street <br /> STM 2017-1,Article 3 Design Development $50,000 Swing Space <br /> For analysis on the decision to replace the current LFDHQ, please see CEC report to STM 2016-5 <br /> released September 14 2016 (and the Errata, released October 26,2016), and the AC report to that same <br /> Special Town Meeting released September 14 2016. <br /> The appropriation requested in this article will provide funds to bring the current design through <br /> construction documents. It is anticipated that there will be a debt exclusion referendum in November or <br /> December, 2017, for the project, including the associated swing-space costs covered under Article 5. <br /> The design,by Tecton Architects, is for a 26,000 square foot facility (the current facility is 11,800 square <br /> feet) on the site of the current LFDHQ and providing: <br /> ' See: Donham&Sweeney Public Safety Building Feasibility Study July 9,2010 (Donham Sweeney Report)Cecil <br /> Group Final Report of the Lexington Ad Hoc Townwide Facilities Master Planning Committee August 30,2013 <br /> (Cecil Group Report);Final Report Town of Lexington Fire Dept. Staffing Study June 2012(Municipal Resources <br /> Report). <br /> 6 <br />