Laserfiche WebLink
APPROPRIATION COMMITTEE SPECIAL TOWN MEETINGS 2017-2&3 OCTOBER 10,2017 <br /> When first opened, the Visitors Center was operated by the Chamber of Commerce. Since 2016, it has <br /> been operated and staffed by the Town's Economic Development Office. Sales revenue from the gift shop, <br /> $197,186 in FY2016,funds the Visitors Center's complete operating costs.Approximately 126,000 visitors <br /> entered the building in 2016. <br /> In October 2011, a new Visitors Center was added to the Town's five-year capital plan. A programmatic <br /> report was produced in 2012, and then revised in 2013. At the 2014 Annual Town Meeting, $220,608 was <br /> appropriated for design development. The plan at that time was to renovate or rebuild the existing Visitors <br /> Center building to include space for visitor education, tour groups, a self-service kiosk, counter space for <br /> assisting visitors,a veterans' display with visual connection to exterior memorials,retail space,food vend- <br /> ing area,new rest rooms, and office space as well as community meeting space. <br /> Mills Whitaker Architects LLC was hired and guided the process further. In view of the condition of the <br /> old building, of the new programmatic needs, and of conceptual plans provided by Mills Whitaker in 2015, <br /> stakeholders and the Selectmen decided to pursue construction of a new building rather than renovation. <br /> An article for the construction of a new Visitor Center was included in the 2016 Annual Town Meeting <br /> Warrant but was indefinitely postponed.In June 2016,Mills Whitaker provided to the Selectmen a revised <br /> estimate of the sum of design and construction costs for a new building of$4,063,675. In view of the high <br /> cost, the Selectmen declined a request by the Tourism Committee to include an article in the Warrant for <br /> the 2017 Town Meeting seeking an appropriation for 25% design funding. The Tourism Committee then <br /> placed a citizen article on the Warrant. That article, Article 18, seeking appropriation of$21,000 to add to <br /> the $130,000 remaining from prior appropriations for additional schematic design funds, was approved. <br /> The resulting plan,made available via a report presented to the Permanent Building Committee on Septem- <br /> ber 4,2017, is Mills Whitaker's attempt to address the shortcomings of the prior design. <br /> The redesign work was based on a review of programmatic goals and feedback obtained through a series <br /> of meetings among the Tourism and Permanent Building Committees, staff, and community stakeholders. <br /> This review resulted in a concept for a building smaller than that originally proposed but one that is larger <br /> than currently exists. The additional space would provide for a better functioning building having adequate <br /> space for visitor interaction with the information desk,historic displays,retail area, and restrooms. <br /> In addition to further refinement of the schematic design, value engineering of the project continues to <br /> address the concerns voiced about the project cost. Currently $202,000 of cost reductions have been iden- <br /> tified; those savings are reflected in the $4,315,000 estimated cost. It is projected that additional value <br /> engineering could yield another$300,000 or more in cost reductions.Currently$30,000 of the appropriated <br /> Schematic Design money remains unspent. <br /> The Tourism Committee is in the process of identifying funding sources besides the tax levy. They are <br /> examining creation of a revenue stream of approximately $16,000 by adding a small surcharge on the sale <br /> of Liberty Ride tickets. They are looking at the qualifications required to obtain a one-time $300,000 grant <br /> from the Massachusetts Cultural Council, as well as other state and federal grants. Additionally,it may be <br /> possible to request funding under the Community Preservation Act for items such as the restoration and <br /> display of current historical artifacts,including the diorama and USS Lexington memorabilia; the creation <br /> of new historical displays; and exterior site work which is covered by the Battle Green Master Plan ap- <br /> proved by the Board of Selectmen in March 2011. <br /> The Tourism Committee and Economic Development Office operate the Visitors Center and the Liberty <br /> Ride, and conduct marketing efforts, and the revenues of these activities cover expenses. Their"Linger In <br /> Lexington" campaign has encouraged tour buses to spend more time in Lexington, and Center businesses <br /> have experienced increased tourist foot traffic and business over the past five years. <br /> As one justification for investing in this project,the Tourism Committee has noted that hotel and meals tax <br /> collections since FY2011 have totaled $8,702,054. Total collections have experienced annual growth in <br /> 19 <br />