Laserfiche WebLink
APPROPRIATION COMMITTEE SPECIAL TOWN MEETINGS 2017-2&3 OCTOBER 10,2017 <br /> This first request is to increase the use of Building Rental Revolving funds from $475,000 to $525,000 to <br /> pay for increased overtime staffing costs incurred in support of Spectacle Management events at Cary Me- <br /> morial Hall. Spectacle Management has already paid into the fund to cover these costs and this appropria- <br /> tion makes that revenue available to pay these costs. The current balance in this fund is $116,376. <br /> The second request is to increase the authorization for use of DPW Compost Operations funds from <br /> $755,000 to $897,000 to replace a storage bin at the compost facility.This storage bin was displaced by the <br /> installation of solar panels at the composting facility, and the solar panel vendor was required to rebuild it <br /> in a new location. The solar vendor asked that the Town find another contractor to do this work. The reim- <br /> bursement money from the solar vendor will be deposited into this revolving fund. The current balance in <br /> this fund is $1,011,139. <br /> The Committee recommends approval of these requests (9-0-0). <br /> Article 2017-3.8: Appropriate Design Funds for Visitors Center <br /> Funds Requested Funding Source Committee Recommendation <br /> $150,000 GF Approve(8-0-1) <br /> This article requests the appropriation of$150,000 to fund production of design development documents <br /> for a new Visitors Center. The building would be located in the current location of the Visitors Center, <br /> across from the Battle Green. <br /> The proposed design is for a two-story building with a full basement,which would have a gross floor area <br /> of 6693 sq. ft. The estimated design and construction cost of the current concept is $4,517,000, although <br /> the Permanent Building Committee (PBC) has identified savings that may reduce the estimated cost to <br /> $4,315,000. The gross floor area of this concept is reduced by 19% from the 8297 sq. ft. area of the 2016 <br /> concept,which in June 2016 had an estimated design and construction cost of$4,063,675.In order to com- <br /> pare the cost estimates of these two designs, the 2016 concept cost has to be adjusted for inflation to a cost <br /> of$4,400,000. This comparison shows the cost per square foot of the 2016 concept as $530, compared to <br /> $645 for the current design after PBC reductions. <br /> The Tourism Committee has recommended a construction start in early November 2018 so that a new <br /> Visitors Center can be completed in time for the Massachusetts 400' celebrations beginning in 2020 and <br /> the 250'anniversary of the Battle of Lexington in 2025. In order to allow occupation of a new building by <br /> April 2020, this Special Town Meeting would have to appropriate $350,000 to cover $150,000 for design <br /> development and $200,000 for construction documents. This would be followed by a request for funding <br /> for construction at the 2018 annual town meeting. As of press time. the Selectmen will only be requesting <br /> $150,000 in design development costs. The Tourism Committee has urged that the Selectmen appropriate <br /> the additional$200,000 for construction documents at this Special Town Meeting,with the stipulation that <br /> this additional funding would be available for release by the Selectmen when they are satisfied with the <br /> results of the design development phase, estimated to be available in February 2018. <br /> The current Visitors Center building was constructed more than 50 years ago. It was designed to provide <br /> rest rooms and information for tourists coming to commemorate the bicentennial of the Battle of Lexington <br /> in 1975. The building is not fully handicapped-accessible, lacks adequate restroom facilities for use by <br /> tourists and Minuteman Bikeway users,is inadequate for accommodating the flow of visitors, and lacks the <br /> technology on which visitors now depend. <br /> 18 <br />