Laserfiche WebLink
A&E Design Development & Construction Documents 6.5% <br />$162,000 7.0% <br />$349,000 <br />A&E Bidding & Construction Administration 2.5% <br />$62,000 2.5% <br />$125,000 <br />FF&E <br />$75,000 <br />$125,000 <br />Transition Costs <br />$0 <br />$50,000 <br />Consultants (legal, testing) <br />$10,000 <br />$101000 <br />Commissioning <br />$15,000 <br />$50,000 <br />Total Estimated Soft Cost for Phase 1 <br />, <br />Hard Cost + Soft Cost <br />$3,011,000 <br />$5,945;000 <br />Project Contingency 3.0% <br />$88,000 3.0% <br />$175,000 <br />3,099,000 <br />$6,120,000 <br />Other Considerations <br />Sidewalk Design <br />$20,000 <br />$20,000 <br />Sidewalk Construction <br />$100,000 <br />Additional Fees (Constructability & Carriage House Evaluation) <br />$50,000 <br />$80,000 <br />'.• 1#1 '�. 1 #11 <br />LEXINGTON COMMUNITY CENTER— March 5, 2014 Stettian Bradley Architects United States • United Kingdom • Canada • China <br />