|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-03-05-CCAC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Community Center Advisory Committee, Ad hoc - CCAC (2013-
>
Minutes
>
2014
>
2014-03-05-CCAC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:23:30 PM
Creation date
9/19/2017 10:46:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A&E Design Development & Construction Documents 6.5% <br />$162,000 7.0% <br />$349,000 <br />A&E Bidding & Construction Administration 2.5% <br />$62,000 2.5% <br />$125,000 <br />FF&E <br />$75,000 <br />$125,000 <br />Transition Costs <br />$0 <br />$50,000 <br />Consultants (legal, testing) <br />$10,000 <br />$101000 <br />Commissioning <br />$15,000 <br />$50,000 <br />Total Estimated Soft Cost for Phase 1 <br />, <br />Hard Cost + Soft Cost <br />$3,011,000 <br />$5,945;000 <br />Project Contingency 3.0% <br />$88,000 3.0% <br />$175,000 <br />3,099,000 <br />$6,120,000 <br />Other Considerations <br />Sidewalk Design <br />$20,000 <br />$20,000 <br />Sidewalk Construction <br />$100,000 <br />Additional Fees (Constructability & Carriage House Evaluation) <br />$50,000 <br />$80,000 <br />'.• 1#1 '�. 1 #11 <br />LEXINGTON COMMUNITY CENTER— March 5, 2014 Stettian Bradley Architects United States • United Kingdom • Canada • China <br />
The URL can be used to link to this page
Your browser does not support the video tag.