Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-03-05-CCAC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Community Center Advisory Committee, Ad hoc - CCAC (2013-
>
Minutes
>
2014
>
2014-03-05-CCAC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:23:30 PM
Creation date
9/19/2017 10:46:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings <br />• The technical analysis found that implementing the project in one phase <br />instead of two should only extend the occupancy date by 4 to 6 weeks, with an <br />opening of the first week in March. <br />• The capital costs to perform the work in two phases increases direct costs <br />approximately $382,000, increasing project costs $484,000. <br />• The existing building has good insulating properties, and adding additional <br />insulation does not improve comfort or enough energy savings to justify the <br />expense. <br />• Replacing the chiller and boiler with more efficient, newer equipment would <br />result in a simple pay back of 27 years <br />LEXINGTON COMMUNITY CENTER — March 5, 2014 Steffian Bradley Architects United States • United Kingdom o Canada • China <br />