2. D&W update on Walsh Brothers <br />At Schematic Design there were issues getting aligned with large budget variances between the Designers <br />estimate and Walsh Brothers estimate which became a concern by the project team. <br />Recently that concern was raised to Walsh Brothers to determine if this was a viable path forward with them on <br />the team <br />There was a meeting on the 20th at DiNisco's office where the issues were openly discussed and the team is <br />confident that we can work together to solve the earlier issues in the next Design Development phase. The team <br />agreed that we are moving into DD with Walsh Brothers. <br />3. DiNisco update on Green Engineer and Traditional Energy <br />The PBC was forwarded a copy of the Green Engineers latest report which focused on evaluating the building <br />Geothermal system and the overall energy consumption and cost compared to a traditional natural gas boiler <br />and chiller system. The conclusion of this report indicates that the Geothermal system consumes more energy <br />at todays' current electrical and natural gas rates, is not forecasted to result in any payback for the useful life of <br />the building, and has an increased cost of more than $2 Million. <br />With this new information, the PBC discussed many other beneficial uses for that level of "sustainable energy' <br />investment in other places that actually have a positive impact on sustainable energy use. The PBC <br />recommended that this report be circulated to the Lexington policy makers, School Committee and the <br />Sustainable Lexington Committee for their review and action. It was noted that Geothermal decision has been <br />made by the Lexington policy makers and they would need to change that decision for the project to proceed <br />with conventional heating and cooling. The Designer was asked if there was time to switch HVAC generating <br />systems and stay on schedule, to which they stated that the decision would need to be made in the next 2 or 3 <br />weeks to stay on track. <br />The Chair stated that the PBC had asked for this evaluation from the Designers' consultant, the Green <br />Engineer. This report from the Green Engineer does not support the use of a Geothermal system and therefore <br />the town has reason to review this information again. The PBC asked the Public Facilities Department to <br />forward this report to the Sustainable Lexington Committee for their comments, and then to the Lexington policy <br />makers and School Committee for their reaction to this new information which potentially could be a decision to <br />eliminate the Geothermal system from the project. The PBC stressed that this review must be conducted quickly <br />as after 3 weeks there could be schedule impacts to the design and project schedule. <br />Several other PBC discussions focused on the impact of changing systems in terms of space in the building for <br />NG boilers, roof space for equipment, schedule impacts in construction which would be explored in depth upon <br />receiving a different direction form the Town. <br />4. DiNisco review of Design Development Schedule and input opportunities <br />DiNisco Design presented the Design Development updates via the attached handout: (summary of the handout <br />below) <br />i. August 16 — Early Release Packages and site logistics <br />ii. September 6 — Site plan <br />iii. September 20 — Interior & exterior finishes: review key spaces- caf/stage, library, lobby <br />iv. October 4 — IT & security <br />v. October 18 — LEED & Sustainability <br />vi. November 1 — MEP & Systems integration <br />Hastings portion of the meeting ended at 7:40PM <br />