|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-07-12-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-07-12-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:59 PM
Creation date
9/7/2017 10:03:18 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Fire Station Project Update —Jeff McElravy (Tecton Architects) & Dennis Ross (Pacheco Ross <br />Architects) <br />Jeff and Dennis each reviewed their conceptual plan for the new Fire Station. One conception <br />showed a modern look with straight lines and a lower roof line; while the other showed a little more <br />of a traditional look utilizing an arch look around bay doors, entrance and some windows having <br />dormers. The floor plans were essentially the same. <br />• Parking for public access was addressed. Parking was shown on the Camellia Place Street <br />side, up against the Fire Station building. The Memorial Flag & Memorial would be in the <br />plaza at the main entrance on the Bedford Street side. <br />• Bay heights of 18 feet provide easy space to use in the Mezzanine area on the 2nd floor, <br />showing reorientation of the vestibule and training room. <br />• HDC asked about the use of solar and possible use for thermal and Photovoltaic. HDC also <br />mentioned panels that look like the roof which could lay flatter and not be seen. <br />• It was mentioned there is a lot of storm water management to be addressed. <br />• PBC asked about sustainability and PV locations, there was some discussion, but <br />engineering work remains in these areas. <br />The consensus at tonight's meeting was the modern design for the Fire Station was preferred. <br />Motion to adjourn was made and seconded: Meeting adjourned at 9:25pm. <br />PBC Meeting 07.12.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.