|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-06-14-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-06-14-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:59 PM
Creation date
9/7/2017 10:01:44 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion changed to accept amended minutes as are outlined in 1- 4 above. <br />VOTE: Unanimous to approve <br />2. Budget Update and Submission of the Schematic Design: <br />T. Elmore reviewed the copy of the budget summary that was reviewed with the Lexington <br />School Committee, pointing out that the Project cost of $65.28 Million was voted and <br />unanimously approved by the Lexington School Committee on the 6th of June 2017. He also <br />had provided a copy of the Table of Contents of the Schematic Design submission that would <br />be delivered to the MSBA on June 29th, if the PBC voted tonight to have the OPM and <br />Designer submit the schematic design, at a budget of $65.28 Million. <br />The committee asked a few questions about the make-up of the Total Project Budget <br />numbers and the Value Engineering process going forward. T Elmore explained that once <br />this number has been agreed to with the MSBA, we can continue to look for ways through the <br />value engineering process to reduce the cost. As we go through the next steps and phases <br />we will continue to find Value Engineering items to be added to the list for review. It was <br />noted that the number for the project with the MSBA is capped once the MSBA Board <br />approves the Schematic Design Submission and issues/executes the project funding <br />agreement. The budget can go down, but not above the agreed upon project budget amount. <br />Motion to authorize the OPM and Designer to proceed with the submission of the <br />Schematic Design to the MSBA, for a total project cost of $65,280,000 as approved by <br />the Lexington School Committee on June 6th, 2017, by Howard Hobbs, and 2nd by Phil <br />Coleman. <br />Discussion: None <br />VOTE: 6 for the motion; 0 against, 0 abstentions <br />Motion Passes. <br />(Certification of the vote was signed by the chair) <br />3. Upcoming PBC Meetings: <br />a. Scheduled meetings — <br />i. June 28, 2017 — PBC Meeting <br />4. Hastings Discussion adjourned at 8:32 PM — Minutes provided by T. Elmore, Dore & <br />Whittier management Partners <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.