Laserfiche WebLink
-2- <br /> 5 No recommendation on a center by-pass It was bypassed <br /> (6 Agreed with Director of Public Works - direct access to Grant Street <br /> is not possible ) <br /> 7 Re removal of 2 parking spaces on Mass Ave to extend the right turn <br /> land onto Waltham Street and 2 spaces on Waltham Street to facilitate <br /> right turn stacking It was decided to keep the 4 spaces as is <br /> EDISON WAY AND PARKING LOT <br /> Parking spaces in the lot should be at a 90 degree angle (Extra <br /> pavement between Grant Street and Edison Way to be designated <br /> right: turn lane ) Edison Way to be one 'way and continue_the one-way <br /> to the rear of Craft Cleaners, then left and left again, making counter- <br /> clockwise rotary around Craft cleaners This would eliminate a left turn <br /> into the parking lot in front of Craft Cleaners <br /> MERIAM STREET LOT/R.R. AREA <br /> It was agreed to allow fexibility in where the turnover parking is <br /> located vs the all-day parkers. The aim is to have the lot serve to <br /> its maximum capability with emphasis on shoppers getting the optimum <br /> location Henry Patterson, Jacqui Bateson, Dave Wells and Wally will <br /> look into the best locations for short turnover parking for better utili- <br /> zation of the site and push for enforcement of the regulations of the lot <br /> BEDFORD STREET, HARRINGTON ROAD AND HANCOCK STREET CIRCULATION <br /> Referred to staff to work through <br /> (REVERSAL AND CHANNELIZATION) <br /> (Reversal - channelization at) Woburn Street and Mass Avenue Staff to <br /> work this out Suggest use of cones on an experimental basis <br /> (Channelization) at Minuteman statue area discussed Staff will examine <br /> It was suggested that staff come back in January with a presentation on <br /> the scope of these work projects <br /> AGENDA ITEM 3 Further discussion of Park Drive parking Possible warrant article <br /> Wally gave the background on the land between the end of Muzzey Street <br /> and the high school He reported that the land is under the protection <br /> of parks and recreation, and that in order to get land to build the high <br /> school, the requirements were a 2/3rds vote of the Town Meeting and a <br /> petition to the Legislature to change the use <br /> Wally showed plans for a larger parking lot at the end of Muzzey Street <br /> adjacent to the high school Don Olsen pointed out the conflict of com- <br /> bining streets with parking lots Wetland will also be involved there <br /> Wally, Olsen and Bowyer will explore feasibility Dave Wells will talk <br /> to the Christian Science Church to see how they feel about renting some <br /> of their back land and building parking The church has also expressed <br /> need for parking Chairman Battin will talk to the school committee to get <br /> their reaction to parking She will also ask them about possible abandon- <br /> ment of the school administration building in the future Wally also <br /> briefed us on the costs of a better landscaped parking lot at the school <br /> administration lot It requested the Land Use Subcommittee be asked <br />