|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2024-02-26 SB Packet - Released
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Agenda Packets
>
2024
>
2024-02-26 SB Packet - Released
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2024 12:40:37 PM
Creation date
2/27/2024 12:43:35 PM
Metadata
Tags
_OCRd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ ■ <br /> ar � n a �ons <br /> We recommend installing 70 Level 2 dual-port <br /> ���l IJIIIII�IIIIIIUIIIIII li�+�������t������� �°`�� '�� <br /> � � <br /> charging stations and 2 dual-port direct current ' �� - � <br /> �������„ <br /> fast cha rgi ng (DCFC) 120kW cha rgi ng stations. <br /> , ��,i �� h� <br /> ,. <br /> � % � <br /> These values were determined using the estimated <br /> �; <br /> , <br /> annual miles traveled of the vehicles parked at <br /> each location. ��� <br /> � ,,,;; <br /> � <br /> f <br /> Assuming that the incentives from available <br /> funding programs will cover at least 80 percent of ���f,,, <br /> charging station equipment and installation costs, ,� <br /> ; <br /> we estimate that Lexington will pay about $6,900 ��������������� <br /> per dual-port charging station and about$15,000 per DCFC charging depot.This cost estimate is subject <br /> to change depending on the availability of the stations and incentive amount received. <br /> The number of charging stations recommended for each garage location is outlined in Table 1. We <br /> estimate that one Level 2 charging station will be required for every 24,000 annual miles traveled. <br /> Finally, we suggest one DCFC charging station per fire department location. <br /> Table 1. Number of chargers recommended at each garage location. <br /> DPW/Facilities 201 Bedford St 78 968,844* 40 <br /> DPW 60 Hartwell Ave 2 6,432 1 <br /> Fire 1006 Mass Ave 5 22,924* 1 1 <br /> Fire HQ 45 Bedford 14 112,494* 1 1 <br /> LUHD/TOB 1625 Massachusetts Ave 7 50,166 2 <br /> Police 1575 Massachusetts Ave 21 525,000* 22 <br /> Schools Schools 1 3,000* 1 <br /> Unknown N/A 5 67,000* 3 <br /> TOTAL 133 1,755,860 70 2 <br /> *Mileage was not provided for some of the vehicles in these departments,and therefore we used average values from similar vehicles. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.