Laserfiche WebLink
Minutes of the Lexington Zoning Board of Appeals <br />Selectmen's Meeting Room <br />February 23, 2017 <br />Board Members Present: Chairwoman, Jeanne K. Krieger, Edward D. McCarthy, <br />Martha C. Wood, Ralph D. Clifford, and Associate Member Hank Manz <br />Also present at the hearing was Alternate James A. Osten <br />Administrative Staff: David George, Zoning Administrator <br />Address: 29 Fairlawn Lane <br />The petitioner submitted the following information with the application: Nature and <br />Justification, Plot Plan, and Photographs. <br />Prior to the meeting, the petitions and supporting data were reviewed by the Building <br />Commissioner, Conservation Administrator, Town Engineer, Board of Selectmen, the <br />Planning Director, the Historic District Commission Clerk, Historical Commission, <br />Economic Development, and the Zoning Administrator. Comments were received <br />from the Conservation Administrator, Planning Office, and Zoning Administrator. <br />The petitioner is requesting a VARIANCE in accordance with the Zoning By -Law <br />(Chapter 135 of the Code of Lexington) section 135-4.1.1, Table 2 (Schedule of <br />Dimensional Controls) to allow a front yard setback of 28 ft 4 in instead of the required <br />30 ft. <br />The Chairwoman opened the hearing at 7:46 pm. <br />Mr. John Farrington and Mr. Roy Antonelli, the Contractor, presented the petition. <br />They represent Naplex Development, which is managed by MaryBeth Busa. The right <br />side of the house protrudes into the front yard setback by 1 ft 2 in. The lot has all of <br />the reasons to support a variance: topography, lot shape and soil conditions. The final <br />as -built plan shows there is a pond in rear of lot and the back 1/3 of the house is within <br />the 50-100 ft wetland buffer zone. The rear section of the lot between the 50ft and <br />100ft buffer zone changes grade dramatically — approximately 12ft in a 10 ft span. <br />The front lot line is curved, not straight. If you compare the plot plan submitted for the <br />building permit to the final as -built plot plan, you can see that the house was shifted 4 <br />inches to the left of the left-hand lot line and rotated slightly so that it's shifted 1 inch <br />closer to the right side lot line. The reason for the shift was due to the soil conditions <br />found when the rear foundation footing was dug. The shift resulted in the garage <br />overhang to the right of the house violating the 30 ft front yard setback requirement. <br />The front gutter and part of the overhang can't be removed and roof line cut back. <br />Because of wetland conditions, all roof run off must be contained by gutters and roof <br />pirch into drainage structures. Changing the pitch of the roof would require the entire <br />garage to be re -built. The violation is de minimous. The applicant is requesting a <br />variance from the 30 ft front yard setback requirement to 28 ft 2 inches for the garage <br />overhang area only. <br />7 <br />