Laserfiche WebLink
The commission asked for clarification about the wetlands line. The commission stated that there <br />were some wetland plants in areas that were labeled as upland. The commission stated that they <br />would like to be present for more soil samples. <br />The commission asked if a do not disturb area is proposed. The applicant stated that there is an <br />area proposed and they can add FENO markers. <br />Questions and comments from the audience: <br />Ron Strerning, 3 Glynn Road, stated that he is concerned about potential flooding in the area. He <br />explained that there is already some ponding on site. <br />Motion to continue the hearing to 4/18/2017 made by Mr. Wolk and seconded by Mrs. Dohan. <br />Vote: 5-0 in favor. <br />8:29pm <br />DET 16-8 <br />RDA, 90 Grant Street <br />Owner/applicant: J and N Design and Build <br />Project: Request to amend approve drainage plan <br />Motion to continue the hearing to 6/12/2017 at the applicant’s request made by Mrs. Dohan and <br />seconded by Mr. Langseth. Vote: 5-0 in favor. <br />8:30pm <br />DEP 201-1050, BL 1007 <br />NOI, Route 2 <br />Applicant/owner: Mass Department of Transportation <br />Project: Stormwater management improvements <br />Lori Kennedy- VHB, MassDOT Representative <br />Questions and comments from the commission: <br />The commission stated that they were appreciative of the applicant’s having researched the <br />possibility of installing oil hoods for the catch basins and understand why they cannot include <br />those in this project. <br />The commission stated that there are some plants on the planting plan that are non-native <br />species. MassDOT stated that they would look into this problem and address it. <br />The commission asked for more specification for the maintenance plan. The applicant explained <br />that they do not have a specific maintenance plan for each specie proposed. She explained that <br /> <br />