Laserfiche WebLink
Ms. Sommers explained that she delineated the wetlands last fall. She stated that the stream in <br />that area is considered intermittent. The site is relatively flat. <br />Mr. Kay explained that the golf green is in bad shape currently. The proposed location of the <br />new green will be further from the wetlands than the existing green. A wetland seed mix will be <br />planted in the area that is being abandoned and will not be mowed. He added that the proposed <br />drainage system will be connecting to an existing system. <br />Mr. Hamilton entered the engineering report into the record. <br />The commission stated that they were not comfortable closing the hearing until the Town <br />Engineer’s issues were addressed. <br />Motion to continue the hearing to 4/18/17 made by Mr. Wolk and seconded by Mrs. Dohan. <br />Vote: 5-0 in favor. <br />7:49pm <br />DEP 201-1054, BL 1011 <br />NOI, 16 Hickory Street <br />Applicant: Sramowicz Construction LLC <br />Owner: Jun Wang <br />Project: Raze and Rebuild of a Single Family Dwelling <br />Nick Pauling- GPR Engineering <br />Mr. Pauling provided the Commission with an updated letter from the project wetlands scientist <br />detailing his delineation. He stated that they are proposing to raze and rebuild a Single Family <br />home. Subsurface infiltration systems are proposed for stormwater mitigation. They are also <br />proposing a wetland restoration plan. <br />Questions and comments from the Commission: <br />The commission asked if the proposed walkway and patio were considered pervious in the <br />stormwater calculations. Mr. Pauling explained that he calculated the walkway and patio as <br />impervious. <br />The commission asked for more details regarding the third infiltration pit, Mr. Pauling stated that <br />this pit would be for a future sump pump. He said he will provide the commission with some <br />general calculations. <br />The commission asked if there were emergency overflows on the gutters. Mr. Pauling explained <br />that the model would not work showing the overflows at the gutter rather than at the systems, but <br />they will add them to the plan. <br /> <br />