|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-04-04-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2017
>
2017-04-04-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:36 PM
Creation date
5/2/2017 3:33:36 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sommers explained that she delineated the wetlands last fall. She stated that the stream in <br />that area is considered intermittent. The site is relatively flat. <br />Mr. Kay explained that the golf green is in bad shape currently. The proposed location of the <br />new green will be further from the wetlands than the existing green. A wetland seed mix will be <br />planted in the area that is being abandoned and will not be mowed. He added that the proposed <br />drainage system will be connecting to an existing system. <br />Mr. Hamilton entered the engineering report into the record. <br />The commission stated that they were not comfortable closing the hearing until the Town <br />Engineer’s issues were addressed. <br />Motion to continue the hearing to 4/18/17 made by Mr. Wolk and seconded by Mrs. Dohan. <br />Vote: 5-0 in favor. <br />7:49pm <br />DEP 201-1054, BL 1011 <br />NOI, 16 Hickory Street <br />Applicant: Sramowicz Construction LLC <br />Owner: Jun Wang <br />Project: Raze and Rebuild of a Single Family Dwelling <br />Nick Pauling- GPR Engineering <br />Mr. Pauling provided the Commission with an updated letter from the project wetlands scientist <br />detailing his delineation. He stated that they are proposing to raze and rebuild a Single Family <br />home. Subsurface infiltration systems are proposed for stormwater mitigation. They are also <br />proposing a wetland restoration plan. <br />Questions and comments from the Commission: <br />The commission asked if the proposed walkway and patio were considered pervious in the <br />stormwater calculations. Mr. Pauling explained that he calculated the walkway and patio as <br />impervious. <br />The commission asked for more details regarding the third infiltration pit, Mr. Pauling stated that <br />this pit would be for a future sump pump. He said he will provide the commission with some <br />general calculations. <br />The commission asked if there were emergency overflows on the gutters. Mr. Pauling explained <br />that the model would not work showing the overflows at the gutter rather than at the systems, but <br />they will add them to the plan. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.