Laserfiche WebLink
8:21 pm <br />DEP 201-1050, BL 1007 <br />NOI, Route 2 <br />Applicant/owner: Mass Department of Transportation <br />Project: Stormwater management improvements <br />Motion to continue the hearing to 4/4/17 at the applicant’s request made by Mr. Beuttell and <br />seconded by Mrs. Dohan. Vote: 5-0 in favor. <br />8:21pm <br />DEP 201-1048, BL 1005 <br />NOI, 85 Kendall Road <br />Owner/applicant: Feng Gao <br />Project: Home addition <br />Motion to continue the hearing to 4/4/17 at the applicant’s request made by Mr. Beuttell and <br />seconded by Mrs. Dohan. Vote: 5-0 in favor. <br />8:22pm <br />DEP 201-939, BL 898 <br />30 Oakmount Circle, Amendment to Order of Conditions <br />Applicant/owner: Copley Design <br />Modification to the house footprint and watershed areas and realign drainage systems <br />Request to extend Order of Conditions, DEP File # 201-939, BL 898, Oakmount Circle due to <br />expire on September 8, 2017 for one year to September 8, 2018 <br />Scott Kenton, owner and Dan Orwig- project engineer <br />Motion to extend the Order of Conditions for one year made by Mr. Langseth and seconded by <br />Mr. Beuttell. Vote: 5-0 <br />Mr. Orwig explained that some changes have been made to the plan since they last were in front <br />of the commission to appease some of the abutters. A small wall with some plantings have been <br />added to the side of the house to create a buffer between properties. The drainage system has <br />been slightly modified to replace the infiltration system in the driveway with a retention area that <br />will discharge to the infiltration system in the street. <br />Mike Julian of EagleBrook Engineering, who is the peer reviewer engineer, explained that the <br />neighbors are supportive of the changes in the project. <br />Questions and comments from the commission: <br /> <br />