Laserfiche WebLink
7:54pm <br />DEP 201-XXXX, BL XXXX <br />NOI, 24 Constitution Road <br />Owner/applicant: Tracy Kemp <br />Project: Home addition <br />Markus Pinney, Environmental Consultant and Peter Gammie, Project Engineer <br />Mr. Pinney explained that the applicant is proposing to two build two additions to their existing <br />home. In the rear of the property, there is a steep slope that drops off to a wetland. The proposed <br />additions would be no closer to the wetlands than the existing home. <br />Mr. Gammie stated that because of shallow ground water, they were limited as to what <br />stormwater mitigation options they had. They have chose to propose a rain garden in the rear of <br />the property. All of the roof run off from the existing house will make its way to the rain garden. <br />There is an existing stormwater system that is no longer functioning and will be taken off line. <br />Pervious pavers will be used for the driveway and patio. <br />Mr. Hamilton entered the engineering report into the record. <br />Questions and comments from the Commission: <br /> The commission asked why the wetlands line has changed since it was last reviewed in 2012. <br />Mr. Pinney explained that the change is very obvious on site and he wants to schedule a site visit. <br />The Commission agreed to visit the site on 4/1/17. <br />The commission asked if the back patio was approved under the initial Order of Conditions. Mr. <br />Pinney explained that it was not. The commission requested that the stormwater calculations be <br />rerun to not include the patio in the existing conditions. The applicant agreed. <br />The commission asked for some clarifying details regarding the rain garden. <br />The commission asked the applicant to come with more details regarding what type of vegetation <br />they are proposing for the rain garden. The commission stated that they were concerned because <br />the condition of the rain garden will vary from wet to dry frequently. Mr. Pinney stated that he <br />will do more research into appropriate vegetation. <br />The commission asked that downspout overflows be added to the plans. The applicant agreed. <br />Motion to continue the hearing to 4/4/17 at the applicant’s request made by Mr. Beuttell and <br />seconded by Mr. Langseth. Vote: 5-0 in favor. <br />CONTINUED MEETINGS/HEARINGS <br /> <br />