|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-02-16-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-02-16-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:59 PM
Creation date
4/24/2017 11:36:22 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Chairman: Jon Himmel <br />Peter Johnson, Dick Perry, Carl Oldenburg, Philip Coleman, Charles Favazzo <br />Project Specific Members <br />Diamond Middle School Hastings Elementary Fire Station <br />Margaret Coppe Curt Barrentine Robert Cunha <br />Edwin Goodell Andrew Clarke Joseph Sirkovich <br />Clarke Middle School <br />Lee Noel Chase <br />Howard Hobbs <br />Visitors Center <br />Joel Berman <br />Peter Kelly <br />February 16, 2017 <br />Members Present: Peter Johnson, Dick Perry, Carl Oldenburg, Philip Coleman, Charles Favazzo, <br />Howard Hobbs, Edwin Goodell, Robert Cunha, and Joseph Sirkovich <br />Members Absent: Jon Himmel, Peter Johnson, Lee Noel Chase, Margaret Coppe, Edwin Goodell, <br />DPF Staff: Patrick Goddard, Director of Public Facilities, Mark Barrett and Ann Marie Ponzini <br />7:10 - The meeting was called to order. <br />Clarke/Diamond Status Update - Paul Kalous (Hill) & Ken DiNisco (DiNisco Designs) <br />Hill's slide presentation reviewed December/January Schedule Priorities, February Schedule <br />Priorities, and Budget Information. <br />• Clarke — December/January Priorities <br />o Underground plumbing — 100% complete. <br />o Slab on deck and slab on grade — 100% complete. <br />o Main roof blocking & install — 100% complete. <br />o Framing exterior walls — 80% complete. <br />o Started exterior sheathing and AVB — 60% complete. <br />o Started overhead MEP rough in — 50% complete. <br />o Building weathertight — achieved on 2/3/2017 (except stair 5). <br />o Commissioning punch list for locker rooms — 100% complete. <br />• Clarke — February Priorities <br />o Complete exterior sheathing and AVB. <br />o Complete MEP overhead rough in. <br />o Install roof at stair 5. <br />o Complete detailing of main roof. <br />o Start interior framing. <br />o Start in wall MEP rough in. <br />o Start exterior masonry facade. <br />• Diamond — December/January Priorities <br />o Underground plumbing — 100% complete. <br />o Slab on deck and slab on grade — 100% complete. <br />o Roof membrane installation at classroom addition — 100% complete. <br />o Tarp installation for temporary heating at cafeteria — 100% complete. <br />201 BEDFORD STREET • LEXINGTON, MASSACHUSETTS 02420 <br />
The URL can be used to link to this page
Your browser does not support the video tag.