Laserfiche WebLink
UPDATES &ERRATA TO CAPITAL EXPENDITURES COMMITTEE REPORT TO 2017 ATM&STM 2017-1 <br /> costs (i.e., from the current Concept Design through Construction) to about <br /> $4,047,000. <br /> (2) Second Paragraph: <br /> (a) 2nd Line: Replace "(last reported to be about $130,000 GF) and more GF, if <br /> necessary,"with"and$21,000 GF more". <br /> (b) Last Line: Append"One member supported the full funding request because Town Meeting <br /> had previously voted funding to develop through the Concept/Feasibility Stage so the second <br /> appropriation should take the project at least to the Design Development stage. <br /> Page 65: In the Article 21 header, under Funding Source, append " + $9,089 Water EF (Cash) + $4,085 <br /> Sewer EF (Cash)". <br /> Page 66: For Article 22: <br /> a. In the header: <br /> (1)Under Funds Requested: Replace, in its entirety,with"N/A". <br /> (2)Under Funding Source: Replace, in its entirety,with"N/A" <br /> (3) Committee Recommends: Change "Approval (5-0)" to "Approval of Indefinite <br /> Postponement(5-0)". <br /> b. In the two paragraphs of supplemental text ("The same purpose...to project costs"), delete all <br /> but the first sentence in the first paragraph. <br /> Page 69: For Article 28: <br /> a. In the header: Change all the"1 BD"s to "N/A"s. <br /> b. In the supplemental text: Between "planned" and"action", add"capital-related". <br /> Appendices: Substitute the last three of the eight attached pages. <br /> a. Appendix A: Updates the purpose of the new PILOP SF and the Note to reflect those actions <br /> were taken. <br /> b. Appendix B: Contains status, dollar amount, and fund-source changes addressed above. <br /> Attached: <br /> Revised Pages 3 &4; Revised Pages 11-13 (with a deliberate blank reverse); and Revised Pages A-1, <br /> B-1, &B-2 <br /> 4 <br />