|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-04-21-CEC-ATM-STM1-rpt (Errata)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2017
>
Reports
>
2017-04-21-CEC-ATM-STM1-rpt (Errata)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:05 PM
Creation date
4/21/2017 4:18:37 PM
Metadata
Fields
Template:
Archives
Year
2017
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE UPDATES & ERRATA TO CAPITAL EXPENDITURES COMMITTEE REPORT TO 2017 ATM & STM 2017-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPDATES &ERRATA TO CAPITAL EXPENDITURES COMMITTEE REPORT TO 2017 ATM&STM 2017-1 <br /> Page 53: <br /> a. In the sub-Article(o) under Funding Source: Change "Cemetery Special Revenue Account" to <br /> "Sale of Cemetery Lots Special Revenue Fund". <br /> b. In the sub-Article(p) under Funding Source: Change "Cemetery Sale-of-Lots Special Revenue <br /> Account"to "Sale of Cemetery Lots Special Revenue Fund". <br /> c. In the sub-Article(q), Supplemental Text: Replace it, in its entirety, with "Two members are <br /> opposed because the additional justification provided was not found to be sufficient to warrant <br /> this expense." <br /> Page 59: In the Article 16 header: <br /> a. Under Funds Requested: Replace"$2,791,418"with"$3,216,418". <br /> b. Under Funding Source: Replace"$222,200"with "$647,200". <br /> Page 60: In sub-Article(d): <br /> a. Under Committee Recommends: Change"4-1"to "5-0". <br /> b. In the supplemental text, rt Line: Change"Four"to "All". <br /> Page 62: In the sub-Article(e): <br /> a. In the quoted text that has continued onto the top of this page, include the following at the end <br /> of, and within, the quote: <br /> The FY2018 request includes additional funds above the annual request which will be <br /> allocated to produce design and construction documents for renovation of the Community <br /> Center portion of the facility at 20 Pelham Road. The design and construction documents <br /> for the Community Center portion of the facility at 20 Pelham Road is $117,750 of the <br /> total$217,979 requested for Public Facilities Bid Documents. <br /> b. In the supplemental text: <br /> (1) Line 1: Change"$117,979"to "$117,750" <br /> (2) Line 3: Change"$71,771"to "$72,000". <br /> Page 63: In sub-Article(j): <br /> a. In the header: <br /> (1)Under Amount Requested: Change"TBD"to "$425,000" <br /> (2)Under Committee Recommends: Change"TBD"to "Approval(5-0)". <br /> b. Delete in its entirety the supplemental text("At the time...taking any position."). <br /> Page 64: In the Article 18 header: <br /> a. Under Funds Requested by Proponent: Change"Unknown"to "$100,000". <br /> b. Under Funding Source: Change"Unknown"to "GF (Cash)". <br /> c. Under Committee Recommends: Change"5-0"to "4-1". <br /> d. In the supplemental text <br /> (1) First Paragraph: Replace in its entirety with: <br /> The amount deferred was the earlier estimate to carry the project from Schematic <br /> Design to Design Development Documents; a more-recent estimate is $80,000. <br /> The last estimated construction cost (including Construction Documents) is <br /> $3,815,000. Also including $131,000 remaining in available, already <br /> appropriated funds and an additional $21,000 toward site—related expenses as <br /> part of Design Development, that would bring the remaining, estimated, project <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.