Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2017 ATM&STM 2017-1 <br /> The last funding of the Center Streetscape Project was at the 2014 ATM, under Article 10(a), where <br /> $600,000 was approved by that Meeting to carry the design to 100%—including bid documents. The <br /> design that had been advanced to the 25% level was stopped at that point because unresolved issues with <br /> the Project led to a failure to get approval of construction funding at the 2015 ATM, under Article 11(a), <br /> for the first phase (the above-cited intersection). As issues with the designs for not only the first phase, <br /> but also the rest of the project, still remained at the time of the 2016 ATM, another request for <br /> construction funds (under Article 10(a))was Indefinitely Postponed. <br /> Because many design elements (primarily,but not solely, related to later phases in the CBD) remained in <br /> question, on February 22,2016, the BoS established a Center Streetscape Design Review Ad hoc <br /> Committee to specifically investigate a broad set of elements and make recommendations to the BoS. <br /> That Committee completed its work and made a final presentation to the BoS in a public meeting on <br /> January 30, 2017. Many of the recommendations for the design choices were not the same as used by the <br /> architects for the 25% design. That Committee urged the BoS to obtain a revised 25% design (and cost <br /> estimate) that reflected their design choices. The BoS accepted all of the proposed design choices and <br /> directed the Town Manager to have the 25% design revised, accordingly. <br /> Articles 10(j) & 12(a) of this ATM were to be the new request for the construction funding for the first <br /> phase of the project; however, based on the need for the revised design, the BoS decided to move for <br /> Indefinite Postponement of Article 12(a)—and the CPC is expected to move the same for Article 10(j)— <br /> with the intent to defer any funding request for this Project to the 2018 ATM. <br /> DPW Equipment <br /> DPW has 160 pieces of significant equipment (includes vehicles). The replacement value for that <br /> equipment today, based on its insured value, is approximately $8 million. This equipment includes pick- <br /> up and dump trucks, construction vehicles, and specialized equipment including pumps, rollers, sprayers, <br /> and mowers. Replacement intervals vary from 5 to 25 years and are based upon manufacturers' <br /> recommendations and DPW experience. Of these, 90 pieces had an individual acquisition cost in excess <br /> of$25,000; therefore, their replacement would normally be characterized as Capital and subject to this <br /> Committee's review. <br /> DPW has developed a well-conceived program, which includes annual updates produced by the Road <br /> Machinery element of the Highway Division and other Division Superintendents, with review by the <br /> Manager of Operations and Department of Public Works Director. This program replaces the older, less <br /> fuel-efficient, and high-maintenance equipment with standard, off-the-shelf vehicles and equipment that <br /> will last longer and cost less to maintain and operate. Replacement of equipment with individual <br /> acquisition costs under $25,000, and of all automobiles, is funded with operating funds. The current <br /> 5-year equipment-replacement schedule projects annual costs between $900,000 to $1,000,000 per year. <br /> The FY2016 funding included the purchase a windrow turner for the compost operation at Hartwell <br /> Avenue. This piece of equipment was added to the budget as a result of the study done in conjunction <br /> with the solar project that was approved for the compost site. That project included the loss of some <br /> composting area and the windrow turner was expected to increase productivity of the remaining <br /> composting area to that of the original area. For the FY2018 funding request, see Article 12(c&n). <br /> 25 <br />