Laserfiche WebLink
Special Town Meeting 2017 -1 <br />Analysis and Recommendations <br />The warrant for the March 2017 Special Town Meeting 2017 -1 lists four articles with financial implica- <br />tions for the Town. Three articles concern major capital projects. The fourth article concerns financial <br />protocol with respect to borrowings. <br />Article 2017 -1.2: Appropriate Design Funds for Fire Station <br />Funds Requested <br />Funding Source <br />Committee Recommendation <br />$450,000 <br />GF Debt <br />Approval (9 -0) <br />The Town purchased the property formerly owned by Liberty Mutual at 171/173 Bedford St. in late 2016, <br />with the intent to prepare that property to serve as swing space, see Article 2017 -1.3 below, while the Fire <br />Headquarters station is demolished and rebuilt. This article requests an appropriation of $450,000 to fund <br />the design of the new station through the schematic design and design development stages. <br />The justification for replacement of the Fire Headquarters station is documented elsewhere. This Com- <br />mittee briefly reviewed the rationale in our "Report to the Special Town Meeting on September 21, 2016" <br />dated September 14, 2016, under Article 2016 -5.2. A brief synopsis of the rationale may also be found in <br />the report of the Capital Expenditures Committee to that special town meeting. The reasons to replace the <br />facility are discussed at length in a report submitted to the Town by consultants Donham & Sweeney Ar- <br />chitects in 20111. <br />If this article is approved, we anticipate that there will be a follow -up request at a special town meeting in <br />the early fall of 2017 for the appropriation of funds to prepare construction documents, do the construc- <br />tion, and manage the project. The preliminary estimate for the cost of preparing construction documents <br />is $550,000; and the preliminary estimate for the sum of the costs of design work, actual construction and <br />project management services is $17,800,000. It is anticipated that the fall appropriation request will be <br />contingent on approval of the exclusion of debt service for the project at a referendum to be held later in <br />the fall. The debt exclusion authority would cover the present request for design funds, which will be <br />financed in the interim by short -term, interest -only bond anticipation notes (BANs), as well as the ex- <br />penses for subsequent phases of the project. In the event that a debt exclusion for the fire station is not <br />approved by voters this fall or in the next year or two, the fire station replacement will not proceed and <br />the $450,000 of debt incurred under this article for preliminary design work would have to be serviced <br />within the non - exempt tax levy. <br />If all approvals are granted according to the anticipated schedule, the new Fire Headquarters station <br />would likely be available for occupancy in late 2019. <br />The Committee unanimously recommends approval of the article (9 -0). <br />Lexington Fire Station Schematic Design Study Report", dated 2/15/2011, Donham & Sweeney Architects. This <br />report is available on the Town website at: http: // records. lexingtonma. gov/ weblink /O /doc /142658/Pagel.aspx. <br />4 <br />