Laserfiche WebLink
Minutes for the Meeting of November 6, 1989 5 <br /> In response to questions from Board members, Mr. Corbin said they were <br /> requesting waivers for two common driveways, and for the width of the pavement <br /> to be 24 feet instead of 30 feet, as required by the Development Regulations. <br /> He pointed out the sidewalk along the entire length of the extension of <br /> Butterfield Road to the junction of Maple Street. He added that, at the <br /> request of the Conservation Commission, they have eliminated one easement that <br /> would have provided a second access to the conservation restriction with a <br /> walking easement along the ridge at the rear of Lots 1,2,3,4 and 5. Ms. <br /> Nordby reported that borings in the roadway have been done to confirm that the <br /> road base meets Town requirements, a schedule of borings has been filed, and <br /> the borings will continue to be monitored by the Engineering Department. <br /> In response to questions from Lawrence Smetana, 4 Lothrup Circle, there are no <br /> Town restrictions on the use of Solomon Pierce Road for construction vehicles. <br /> Mr. Cataldo said he would repair any damage caused by construction vehicles. <br /> Attorney Frederick DeAngelis, representing Mr. Cataldo, said the deeds for the <br /> new lots would be subject to the covenants and declarations of Pheasant Brook <br /> I. He added that the development is in compliance with these covenants and <br /> declarations. <br /> Responding to a question from Sheila Mello, 4 Lothrop Circle, Mr. Bowyer said <br /> standard language in the Special Permit forbids construction work on the sub- <br /> division before 7:00 a.m. and after 5:00 p.m. or sunset, whichever comes <br /> first. <br /> Richard Zangara, 4 Maple Tree Lane, thanked the applicant for addressing the <br /> concerns of the neighbors on Maple Tree Lane, and added he was happy with the <br /> final plan. <br /> Mrs. Wood declared the hearing closed at 9:29 p.m. <br /> Later in the evening, the Board directed the staff to proceed with preparation <br /> of the certificate of action and special permit. <br /> **************************** REPORTS **************************************** <br /> 272. Planning Board. Subcommittees <br /> a. Meagherville Site Development Committee: Mrs. Wood reported the <br /> committee will meet this Wednesday at 7:30 p.m. in the Selectmen's <br /> Meeting Room. Several meetings in November are planned, and they hope <br /> to have the concept plan completed by the end of the month, and be ready <br /> to present a proposal to the 1990 Annual Town Meeting. <br /> b. Waltham Street. Comprehensive Permit: A joint meeting of the Board <br /> and the Selectmen has been scheduled for Monday, November 13, 1989 to <br /> hear a preliminary presentation of the proposal by the applicant. <br /> The meeting was adjourned at 10:15 p.m. <br /> (volij 1,,i'LLLA„,.. <br /> David G. Williams, Clerk <br />