|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2023-10-19-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2023
>
2023-10-19-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:22:48 PM
Creation date
11/13/2023 4:25:56 PM
Metadata
Fields
Template:
Archives
Year
2023
Author or Source
Betty Gau, Committee Member
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LBAC Meeting Minutes <br />6 <br /> <br />Answer: April – Nov 2025 <br />QUESTION – Does Bow St construction impact bikeway? <br /> <br />Answer: Bikeway is MBTA Property with a lease to town of Lexington <br /> <br />Bikeway will be closed for 1 year; construction will be done in phases <br />Peggy – maybe cars can’t park on Mass Ave during this time the bikeway is closed <br />Commuters and students riding will be displaced when the bikeway is closed. <br />Regarding widening the bikeway: Peggy added – putting gravel for 2 ft on both sides of bikeway to <br />widen the path – this would be a great opportunity to have gravel on the bikeway on both sides – <br />Conservation committee allowed it. <br />It would make a difference in terms of the width of the bikeway. <br />MWRA would not be opposed to installing gravel if the town requested it. <br /> <br />Mark Sandeen – the bikeway would be closed for over a year – At SB there would not be construction <br />during the winter so it would be open during the winter – has that changed since SB heard about this <br />last time? <br /> <br />Paul from MWRA – they could be temporary pavement down on the bikeway during the winter but it’s <br />not great. So the bikeway may be open during the winter with the temporary pavement. <br />Bikeway will be closed after Patriots Day 2025 and back in service by Nov 2025. <br />They will be able to get asphalt down in November. – That’s the schedule they are working with <br /> <br />QUESTION from Ram – if the bike lane is on the other side there is a busy exit to Pleasant Street that <br />needs to be taken into consideration. <br />QUESTION from Jim – what will the public outreach be? Will there be plenty of advanced warning / <br />education on using the bike lane, etc. for commuters especially? <br /> <br />MWRA will email us their presentation pack <br /> <br /> <br />3. Committee Input for Select Board Goal Setting – Update from Sarah Hews <br />Select Board had a goal setting review and asked for Committees to provide their highest priority goals. <br />Sarah volunteered to attend the 9/11 7PM facilitator’s meeting. A consultant was hired by the town for <br />the Goal Setting.
The URL can be used to link to this page
Your browser does not support the video tag.