|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2023-10-19-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2023
>
2023-10-19-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:22:48 PM
Creation date
11/13/2023 4:25:56 PM
Metadata
Fields
Template:
Archives
Year
2023
Author or Source
Betty Gau, Committee Member
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LBAC Meeting Minutes <br />5 <br /> <br /> <br />The MWRA has a website for this project. <br /> <br />QUESTION – How will detour be designed off the bikeway? <br />Answer from Ross/DPW – we will use existing bike lanes and install temporary bike lanes from Bow <br />Street to Maple Street. <br />There will be permanent striping and when construction is done the stirping will be removed. <br />Bikeway will be restored to existing or better condition and will be done in 2026. <br />Question: Will there be bike lanes for the detour on Mass Ave? <br />Answer: Ross/DPW - there will be bike lanes but not protected bike lanes; this is a temporary situation <br />while the bikeway is closed. <br /> <br />Sarah – with re paving of bikepath can we widen the bikeway? MWRA does not know and will only be <br />restoring it to the existing condition. <br />In general, can the bikeway be widened? <br />Ross will not rule it out <br /> <br />QUESTION – How long will the bikeway be closed?
The URL can be used to link to this page
Your browser does not support the video tag.