Laserfiche WebLink
LBAC Meeting Minutes <br />5 <br /> <br /> <br />The MWRA has a website for this project. <br /> <br />QUESTION – How will detour be designed off the bikeway? <br />Answer from Ross/DPW – we will use existing bike lanes and install temporary bike lanes from Bow <br />Street to Maple Street. <br />There will be permanent striping and when construction is done the stirping will be removed. <br />Bikeway will be restored to existing or better condition and will be done in 2026. <br />Question: Will there be bike lanes for the detour on Mass Ave? <br />Answer: Ross/DPW - there will be bike lanes but not protected bike lanes; this is a temporary situation <br />while the bikeway is closed. <br /> <br />Sarah – with re paving of bikepath can we widen the bikeway? MWRA does not know and will only be <br />restoring it to the existing condition. <br />In general, can the bikeway be widened? <br />Ross will not rule it out <br /> <br />QUESTION – How long will the bikeway be closed?