|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-04-28-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2016
>
2016-04-28-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:14 PM
Creation date
6/3/2016 10:42:08 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permanent Building Committee (PBC) <br />201 Bedford Street, Room 221 <br />April 28, 2016 <br />Members Present: Jon Himmel, Eric Brown, Peter Johnson, Phil Coleman, Chuck Favazzo, Lee Noel <br />Chase, Edwin Goodell, Howard Hobbs, Bill Hurley. <br />Members Absent: Dick Perry, Carl Oldenburg <br />Guests: Angle Khazadian and Vivian Lowe - DiNisco Design Partnership; Mike Lambert, Dave Doherty <br />and Bond Brothers; Emily Traversi -Hill International <br />Lexington DPF: Patrick Goddard, Director of Public Facilities and Mark Barrett, RA Project Manager <br />Recording Secretary: Ann Marie Ponzini <br />Eric called the meeting to order at 7:OOpm <br />1. General Business <br />• The members reviewed the PBC minutes dated April 141h, 2016. <br />Motion to approve PBC Committee minutes dated March 14th, 2016 — APPROVED. <br />It was announced that the purpose of tonight's meeting was to review and take action on the Clarke <br />and Diamond Locker room GMP for Bond ($3,634,253) as well as the site enabling GMP ($12,047,613) <br />pending approval of the town override vote on May 3rd <br />2. Discussion of Filed Sub Bid Results <br />Hill distributed a copy of the Summary sheet for the Filed Sub Bid results for the locker room GMP <br />work. <br />Bond informed the committee that due to the timing of the bid relative to the start of summer there was <br />a decrease in the number of sub - contractors available to bid on the summer work, resulting in an <br />increased cost of $293,000 over the original estimates. <br />• Electrical <br />o A high bid was received from Losordo Electric, and it was the only bid for electrical for <br />the summer work. Bond stated Griffin said the job was too small, referring to the locker <br />room work. And that Anese was pre - qualified, however; bid came too late for summer <br />work. Bond stated that there was not enough time to perform another round of sub <br />bidding to try to improve numbers. <br />o PBC asked if Losordo will be able to mobilize in 3 weeks. Bond is in the process of <br />reviewing that but felt that Losordo was large enough to do so. <br />o DPF commented that Losordo was used for the Cary Hall project and the guys did a <br />good job. <br />PBC Meeting 04.28.16 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.