|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-04-14-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2016
>
2016-04-14-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:14 PM
Creation date
5/3/2016 8:30:17 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The DPF's current CxA rep has been participating with design review meetings to date, but that <br />CxA is no longer available. <br />8. On -Site Materials Review <br />• PBC inquired about time for material selections. <br />• A non - quorum site materials review meeting was scheduled for May 5th at 9:OOa at Clarke for 1 <br />hour, followed by a meeting at Diamond for an hour. <br />9. Hastings Update <br />• Andrew Clarke and Curt Barrentine introduced themselves as School Committee Appointees for <br />Hasting's. <br />• DPF handed out a "Draft Hastings Schedule for PBC Comment" for review. <br />• DPF reviewed the Eligibility Period status and enrollment status for Hastings. It was agreed in <br />concept, due to the 645 student enrollment numbers, that 30 classrooms would be planned for <br />the new Hastings project. <br />• An MSBA board meeting is scheduled for 5/25/16. <br />• DPF stated they cannot start RFS until MSBA board votes. <br />• A discussion on numerous scheduling scenarios took place. August 2019 is the goal for the <br />new school building. <br />• MSBA allows 1 year for the full Schematic process, we are looking to do this in 8 months. <br />• PBC's participation in the OPM, Designer, and CM selection process was discussed. <br />• Jon, Dick, and Peter volunteered for OPM selection. <br />• Andrew, Jon /Eric, and Curt volunteered for the Designer process. <br />• Chuck offered to be involved with the CM process. <br />10. Next Meeting Date May on Thursday April 28th at 7:OOpm <br />Motion to adjourn was made and seconded: Meeting adjourned at 9:55pm. <br />PCB Meeting 04.14.16 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.