Laserfiche WebLink
• The DPF's current CxA rep has been participating with design review meetings to date, but that <br />CxA is no longer available. <br />8. On -Site Materials Review <br />• PBC inquired about time for material selections. <br />• A non - quorum site materials review meeting was scheduled for May 5th at 9:OOa at Clarke for 1 <br />hour, followed by a meeting at Diamond for an hour. <br />9. Hastings Update <br />• Andrew Clarke and Curt Barrentine introduced themselves as School Committee Appointees for <br />Hasting's. <br />• DPF handed out a "Draft Hastings Schedule for PBC Comment" for review. <br />• DPF reviewed the Eligibility Period status and enrollment status for Hastings. It was agreed in <br />concept, due to the 645 student enrollment numbers, that 30 classrooms would be planned for <br />the new Hastings project. <br />• An MSBA board meeting is scheduled for 5/25/16. <br />• DPF stated they cannot start RFS until MSBA board votes. <br />• A discussion on numerous scheduling scenarios took place. August 2019 is the goal for the <br />new school building. <br />• MSBA allows 1 year for the full Schematic process, we are looking to do this in 8 months. <br />• PBC's participation in the OPM, Designer, and CM selection process was discussed. <br />• Jon, Dick, and Peter volunteered for OPM selection. <br />• Andrew, Jon /Eric, and Curt volunteered for the Designer process. <br />• Chuck offered to be involved with the CM process. <br />10. Next Meeting Date May on Thursday April 28th at 7:OOpm <br />Motion to adjourn was made and seconded: Meeting adjourned at 9:55pm. <br />PCB Meeting 04.14.16 <br />Page 5 <br />