Laserfiche WebLink
5. Clarke MAAB /Variance <br />• DiNisco reviewed the areas where we are seeking a variance. <br />o A steep hill exists at Clarke, and DiNisco discussed taking the plaza and raising it 4 -5ft. <br />This would get rid of the steps and allow for a real plaza for kids to be safe in, and <br />reduces the steepness which flattens out towards the entrance. <br />o Due to the existing slope, a portion of the walkway cannot be made compliant, and a <br />variance is needed. <br />o The auditorium needs to meet the current code for persons with disabilities allowing <br />access to the stage. A Lift was installed some years ago to give accessibility for this <br />purpose but is now considered non - compliant. The towns Commission on Disability has <br />supported the intent to seek a variance for the existing lift. <br />6. Clarke and Diamond Discussion <br />• Clarke <br />o Plaza design was discussed; the possibility of reducing the canopy size and adding <br />steps to another part of the parking lot. <br />o PBC stated this could be a potential savings of $150,000 and should be reviewed by <br />more than just the Principal. <br />o A comment was made regarding concerns about the kids coming from the fields and <br />walking up the hill /slope to the plaza instead of using the stairs. <br />o PBC stated students coming from fields should be using the gym entrance. They also <br />gave a suggestion about adding stairs. <br />o There was some discussions that the Principals should not have the authority to be <br />making final decisions and that School Committee should be involved. <br />o PBC discussion regarding the stairs included reducing the number of steps, relocating <br />the stairs, and breaking the canopy into two sections so it isn't so high at the bottom of <br />the stairs. <br />• Diamond <br />o DiNisco discussed the landscape and the grade changes around the plaza. He <br />discussed adding bushes and concrete benches, to make the cross grades work at the <br />plaza. <br />o PBC asked about the courtyard space and DiNisco stated it had not been addressed as <br />of yet, but is still on the table. Changes will be reviewed. <br />o Steel alternate was asked about related to the music /drama room, and DiNisco was <br />going to get a price for that. <br />7. Commissioning — Hill <br />• Advertising for a Commissioning Agent will be in the central registry next week. <br />• Hill is looking to receive proposals in two weeks and have an agent selected by 5/13/16 or there <br />about. <br />• Hill stated there is an opportunity to be on the committee to review the candidates. There were <br />no volunteers. <br />• PBC asked what happens if the Commissioning Agent observes anything about the mechanical <br />system, and would it be too late for changes at this point. The CxA will insert a spec section in <br />the final specs and be a part of submittal review. <br />PCB Meeting 04.14.16 <br />Page 4 <br />