Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-02-11-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2016
>
2016-02-11-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:13 PM
Creation date
5/3/2016 5:42:40 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Sub - Contractor Prequalification Process <br />• Qualifications should be finished in the next 2 months. <br />• PBC asked if the RFQ's went out and Hill responded that they have. <br />• Hill informed the board that 98 trades have sent in qualifications. This represents good <br />coverage on the various trades. <br />• PBC asked if they wanted to be involved with this. DPF sent out an email looking for <br />volunteers, but no one was able to commit the time necessary at this time. DPF staff will <br />participate in the process. <br />7. Bridge, Bowman & Fisk Updates <br />• DPF advised that the School Comm. approved the budget for putting a pair of standard <br />modular classrooms at each school (Bridge, Bowman, Fiske). DPF stated they would review <br />these small projects with PBC to gauge their interest but recommend that DPF manage these <br />projects while PBC focused on Clarke, Diamond and Hastings. PBC agreed with updates as <br />needed. <br />• DPF worked with the Principals and the architects to site the modulars for best educational use <br />and constructability. <br />8. Hastings Update <br />• DPF, Lexington is in the eligibility period, working with the School Committee and Building <br />Committee to start a feasibility study agreement for the town manager to sign. <br />• OPM selection is expected by May /June. <br />• The OPM will then do a Design RFQ (summer of 2016). <br />• Lexington is 1 of 8 of the 26 communities selected and allowed directly into the eligibility period. <br />• On 2/22/16 there will be a vote to approve funding of $1,500,000 to be used for this process. <br />• DPF distributed a copy of the school building committee to be sent to MSBA. <br />9. Next Meeting Date on Monday March 7th at 6:OOpm <br />• All in favor of March 7th meeting day and time: Yes. <br />Motion to adjourn was made and seconded: Meeting adjourned at 8:15 p.m. <br />PCB Meeting 02.11.16 <br />Page 3 <br />