Permanent Building Committee (PBC) <br />201 Bedford Street, Room 221 <br />January 14, 2016 <br />Members Present: Jon Himmel, Chairman, Bill Hurley, Carl Oldenburg, Lee Noel- Chase, Philip <br />Coleman, Dick Perry and Chuck Favazzo <br />Members Absent: Peter Johnson, Eric Brown <br />Guests: Ken DiNisco and Vivian Lowe, DiNisco Design Partnership; Mike Lambert, Bond Brothers; <br />Paul G. Kalous, Hill International <br />Lexington DPF: Patrick Goddard, Director of Public Facilities and Mark Barrett, RA Project Manager <br />Recording Secretary: Ann Marie Ponzini <br />Jon Himmel called the Meeting to order at 7:05p.m. <br />1. General Business <br />The members reviewed the PBC Meeting Minutes dated December 10, 2015. The December <br />22, 2016 minutes have not come back from the School Committee as of yet for a final review. <br />Motion to approve PBC meeting minutes dated December 10, 2015 as submitted. <br />Motion carried 6 -0 -0 <br />2. DiNisco Update on Conservation Commission (Con Comm) <br />• DiNisco provided an update on the current status of the project's NOI's to the Conservation <br />Commission. <br />• Prior to the NOI submission DiNisco had met informally with the Conservation Commission, <br />then also met with Con Comm. representatives on a Saturday site walk thru. At each building <br />site. DiNisco recently met with the Engineering dept. as well to review their site questions for <br />each project. <br />• DiNisco appeared before the Con Comm on 1 -11 -6 and made an approx. 20 min presentation <br />on each site /building. <br />• DiNisco believes both projects were received well, and that the diamond project may have a <br />chance to be approved when they return to Con Comm on 1/25/16. <br />• The Clarke project will be discussed at the 1/25 hearing but will likely be continued to 2/8/16 <br />before it would be approved. <br />• DiNisco does not believe that these approval dates would have an impact on the overall <br />schedules. <br />• DiNisco outlined that mobilizations on site could be organized as early as mid -may 2016 and <br />site work and summer space mining could start by mid may on a second shift basis and then <br />days after school is out for summer recess. <br />• Space mining work was planned for completion by 8/15/16. <br />• There was some discussion about adding two classrooms to the Clarke Addition, but DiNisco <br />stated that changing the footprint of the addition would void the conservation commission <br />process completed to date and require that process to start over with new design plans, storm <br />water calculations etc. <br />PCB Meeting 01.14.16 <br />Page 1 <br />