Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2016 ATM <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(b) DPW Equipment! <br />$755,000 <br />$449,000 GF <br />(Debt) + <br />$15,000 GF <br />(Free Cash) + <br />$145,500 <br />Water EF (RE) <br />+ $145,500 <br />Wastewater <br />EF (RE) <br />Approval (5 -0* <br />"This is an annual request to replace equipment that is beyond its useful life and whose mechanical <br />condition no longer meets the requirements of the Department of Public Works (DPW). The DPW has an <br />inventory of 146 pieces of equipment including sedans, hybrid SUVs, construction vehicles and <br />specialized equipment used to mow parks, plow snow, repair streets and complete a variety of other <br />projects. Without regular equipment replacement, the efficiency and cost effectiveness of the DPW's <br />operations would be handicapped due to equipment down time and excessive repair costs. The FY2017 <br />request, by funding source, is shown in the table below. Each piece of equipment is inventoried with <br />original and current replacement cost, state of condition and replacement time interval. Replacement <br />intervals vary from 5 to 25 years, and are based on manufacturer recommendations and use (type and <br />duration). The selection of vehicles to be replaced begins with the proposed replacement date. Then each <br />vehicle is assessed as to its mechanical condition and work requirements. The systematic replacement <br />program defines what equipment is expected to need replacement during the next five years, with the <br />intent of preventing any unexpected emergency purchases. Annual updates are conducted by the Road <br />Machinery Division, Division Superintendents and reviewed by the Manager of Operations and the <br />Director of Public Works.... <br />"The table below shows each piece of eauipment recommended and its nronosed financing source. <br />GF Debt Free Cash Water RE Sewer RE Total <br />1 -F550 Pick Up with Plow <br />$9,000 <br />Committee Recommends <br />$60,500 <br />$60,500 <br />$130,000 <br />1- Rubber Tire Loader with 3 Yard Capacity <br />$85,000 <br />$85,000 <br />$170,000 <br />2- F450 Dump Trucks with Plows (Public Grounds) <br />$200,000 <br />$200,000 <br />1- Holder Tractor with Snow Blower (Public Grounds) <br />$140,000 <br />$15,000 <br />$155,000 <br />1 -F450 Dump Truck with Plow (Highway Division) <br />$100,000 <br />$100,000 <br />$449,000 <br />$15,000 <br />$145,500 <br />$145,500 <br />$755,000 <br />[Brown Book, Pages XI -6 & 21] <br />Project Description <br />Amount <br />Requested <br />Funding <br />Source <br />Committee Recommends <br />(c) Street Improvements and <br />Easements <br />$3,500,000 <br />$2,526,835 GF <br />(Cash) <br />+$973,165 <br />Chapter 90 <br />Approval (5 -0) <br />"This is an annual request for the street resurfacing and maintenance program. <br />"...Funds will be used for design, inspections, planning, repair, patching, crack sealing and construction <br />of roadways and roadway related infrastructure including repair and installation of sidewalks. A <br />preliminary list of the streets to be repaired under this article is currently under development. A pavement <br />management system is utilized to assist in analyzing the road network and selecting roadways for repairs. <br />This model is kept updated on a regular basis. The funding requested will provide a level of funding <br />estimated to move the Town toward a targeted pavement condition index (PCI) of 85." <br />42 <br />