Laserfiche WebLink
estimator for the High School project in addition to the estimator that will be part of the Architectural team. <br /> <br />The attachment A draft discussion was led by Dan Voss and Todd Rhodes; there discussion on each item and <br />suggested updates. Discussion included the Life Cycle Costing tool used in Cost benefit analysis calculations, resilience <br />levels and what they truly meant to operational Capability; EV charging; the phrase “evaluate & report”; <br />Body Carbon, Carbon Footprint, and Landscape or Arborist Commissioning. <br />One of the Attachment A descriptions indicated the need for a submission consistent with Zoning Site Plan Review <br />requirements. It was strongly suggested that the prescriptive language associated with the Site Plan Review be <br />referenced in a way that precluded any misunderstanding that Planning Board involvement was thus triggered. <br /> <br /> <br />The agreed upon edits to the Attachment A were captured by Todd Rhodes of the Sustainable Lexington Committee and <br />will be attached to these minutes. <br /> <br />Motion made to adjourn 7:20 PM <br />motion approved <br />Next meeting 3/9/23