Laserfiche WebLink
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Jon Himmel, Co-Chairman, Charles Favazzo, Co-Chairman, <br />Peter Johnson, Philip Coleman, Celis Brisbin, Elizabeth Giersbach, Frederick Merrill <br />Police Station Members: Semoon Oh, Wendy Krum <br />Associate Members: Curt Barrentine, Henrietta Mei <br /> <br />PBC Minutes for the meeting held on: 2-9-23 <br />Meeting was held remotely via Zoom <br /> <br />Members Present: <br />Jon Himmel, Charles Favazzo, Phil Coleman, Peter Johnson, Celis Brisbin, Elizabeth Giersbach, Semoon Oh, <br />Curt Barrentine, Henrietta Mei <br /> <br />Sustainable Lexington <br />Todd Rhodes, Dan Voss <br /> <br />Others in Attendance: <br />Julie Hackett, School Superintendent <br />Kathleen Lenihan, School Committee and School Building Committee Chair <br />Deepika Sawhney, School Committee vice-chair <br />David Kanter, Capital Expenditure Committee <br />Mike Cronin, Director DPF <br />Mark Barrett, DPF <br /> <br /> <br />The PBC Meeting was called to order at 5:00pm <br /> <br />Meeting Minutes <br />The minutes for 10-25-22 Meeting were held awaiting further comments. The Meeting minutes for the 1-12-23 were <br />approved as noted. The vote was unanimous <br /> <br />Westview Update <br />DPF staff reported that Plumbing and HVAC rough nearing complete. The exterior windows delivered 2/8/23 and <br />install was scheduled to begin on 2/10/23. <br />Electrical rough is scheduled to begin 2/13/23 <br />The Roof top DOAS unit reported as delayed by Manufacturer, no new date was available yet. <br />The exterior metal cladding delivery of 2/7/23 was reported as delayed with no new date yet. <br /> <br />Over the next few weeks we anticipate Inspections, installation of pipe insulation, electrical rough, electrical secondary, <br />and overhead door framing <br /> <br /> <br />Police Update <br />DPF reported that the crane for steel erection arrived on site on 2/8/23, as well as the first three loads of steel <br />Future deliveries of steel will continue periodically, 2/10, 2/13, 2/15 etc. <br /> <br />By mid-day on 2/10/23 the first sequence of steel was approx. 40% in place. <br /> <br />The buildings steel frame and deck has 6 sequences and is scheduled to run to the end of March. <br />Last Pour for concrete pour for foundation walls and footings will take place 2/10/23 <br /> <br />