<br />Upcoming Activities <br />• De-Energize existing facility –Complete by end of week <br />• Field Office trailers –To be delivered next week <br />• Concrete foundations –Concrete precon meeting tomorrow. Mobilize next week <br />• Existing Building Demolition –Target mobilization week of 11/7 <br /> <br /> <br />Solar Canopy <br /> <br />Tecton reviewed the Solar Canopy presentation that was previously presented to the HDC in search of design <br />feedback. <br /> <br />Stakeholder comments were reviewed from Fletcher field master plan and stakeholder meeting. <br />Enhancing the use of Fletcher Field: <br />• Activate a prominent site at the east approach to Town Center. <br />• Enhance existing public events and establish permanent infrastructure for additional organized uses. <br />• Provide for expansion of current organized public events due to increased popularity. <br />• Creating an inviting and safe green space for casual day-to-day public use. <br /> <br />A very brief review of the projected solar area calculations and panel types. <br /> <br />Tecton reviewed Options D and E which were developed out of feedback received from members of the HDC and <br />continued design work. The Overall canopy design was “lightened” from previous versions and one member of <br />the HDC said it was reminiscent of a garden structure. <br /> <br />Slides were reviewed showing multiple views and schemes with and without a “mass ave leg”, which would be a <br />canopy structure over the parking to the east of the new police station and perpendicular to mass ave. <br /> <br />PBC comments included: <br />Likes the simplified design but will require careful planting placement and selections <br />Likes the Mass ave leg and what it does for Fletcher Field. <br />Nicely done, likes the Mass Ave leg. <br />Looks like another building, is that what is wanted? <br /> <br />The height of the canopy was questioned and if it matches the height of the Fire station overhead doors. The <br />reply was that it met or was higher than the 14 ft high apparatus doors. It was suggested that the canopy be <br />restricted to that height. <br /> <br />It was strongly suggested that the canopy design be priced prior to the presentation to the Select Board so the <br />Board would be “seeing the entire picture.” <br /> <br />One member had seen a solar canopy example where there was a space between each row of panels and <br />thought that would be worth looking at. <br /> <br />It was asked why the radio tower was the height it is. DPF replied that the spec that was used in the Town’s RFP <br />for the tower dictated the height, which was 120 ft, and enabled line of sight transmission to other town <br />emergency antennas. <br /> <br />PBC asked if ATM was the target for funding the canopies and if so what was the schedule. <br />The architect briefly reviewed the likely schedule which includes completing foundations and sub-surface design <br />so that pricing can be obtained for early spring work, with phase 2 being the steel frame work and solar canopy, <br />for a Bid. As well as develop estimates for both for Town Meeting. It was recommended that a conceptual <br />estimate be developed by mid-December or early January, if Tecton could arrange this with its estimator, in <br />advance of a lot more design work.