Laserfiche WebLink
DESCRIPTION: This request is for$560,000 to complete the third phase of a five-phase <br /> program to connect the remaining unsewered dwellings to the sewer system. Recently the <br /> State has made requirements for existing and replacement on-site sewerage disposal systems <br /> much stricter under the so-called Title V requirements. These new regulations require strict <br /> visual inspection of the existing components of an on-site system and strict liquid testing of an <br /> existing system when a dwelling is sold. <br /> All of Lexington is presently sewered by the Town's Sewer Collection system except for 29 <br /> street segments. This project will sewer two street segments and install 4650' of sewer <br /> pipeline. <br /> ARTICLE 10 SEWER SYSTEM REHAB PROGRAM <br /> To see if the Town will appropriate a sum of money to remove infiltration of ground water from <br /> the sewer system; determine whether the money shall be provided by the tax levy, by transfer <br /> from available funds, including any special sewer funds, by borrowing, or by any combination of <br /> these methods; or act in any other manner in relation thereto. <br /> (Inserted by the Board of Selectmen) <br /> FUNDS REQUESTED: $3,000,000 <br /> DESCRIPTION: This request proposes to accelerate the sewer rehabilitation program for <br /> completion over a five-year period at a cost of$3,000,000 per year. <br /> ARTICLE 11 STREET RELATED IMPROVEMENTS <br /> To see if the Town will appropriate a sum of money for highway improvements under the <br /> authority of Chapter 90 of the General Laws and any other applicable law; determine whether the <br /> money shall be provided by the tax levy, by transfer from available funds, by borrowing, or by <br /> any combination of these methods; authorize the Selectmen to apply for, accept, expend and <br /> borrow in anticipation of state aid for such projects; or act in any other manner in relation <br /> thereto. <br /> (Inserted by the Board of Selectmen) <br /> FUNDS REQUESTED: $1,255,000 <br /> DESCRIPTION: This article requests $1,255,000 to pave approximately seven miles of <br /> streets. Street resurfacing is part of a systematic replacement program to resurface all 122 <br /> miles of Town streets once every twenty years or less. Although this program has been in <br /> place for fourteen years, only 61 miles rather than 84 miles have been resurfaced, as this <br /> program has not been fully funded in most recent years. <br /> 15 <br />